Valid

YD/T 7010-2026Technology requirements for intent driven management of 5G core network (English PDF)

5G核心网意图管理技术要求

Preview PDF

Also coversYD/T7010-2026 + YDT7010-2026

This is a limited preview

Buy now to download the full PDF (35 pages)

Need quotation for your management?

Get a formal quotation for YD/T 7010-2026 in 30 minutes.

Issued by

Ministry of Industry and Information Technology

Level / Type

Industry · Recommended

Issue date

June 1, 2026

Implementation date

September 1, 2026

Scope

YD/T 7010-2026 is the English-translated version of 5G核心网意图管理技术要求.

The document specifies the technical requirements for intent management of the 5G core network. Intent management lets an operator state a desired outcome for the network, which the system then translates into actions. The requirements mainly cover application scenarios, functional requirements, interface requirements and model requirements. It applies to intent management of the 5G core network.

Telecommunications operators, vendors of 5G core network equipment and management systems, and system integrators and test teams who work on network automation use it. The standard is voluntary, as the /T in its code shows. It was issued by the Ministry of Industry and Information Technology on 1 June 2026 and takes effect on 1 September 2026. It is a new standard, so no earlier edition is replaced.

Found what you need?

Document preview — YD/T 7010-2026

National Standard of the People's Republic of China

ICS
33.060
Classification
M10

Issued by: Ministry of Industry and Information Technology

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

YD/T 7010-2026 is a recommended industry standard of the People's Republic of China in the Telecom sector, approved and issued by the Ministry of Industry and Information Technology on 1 June 2026, with effect from 1 September 2026.

It is administered by the China Communications Standards Association.

Classification: ICS 33.060; CCS M10.

1 Scope

The document specifies the technical requirements for intent management of the 5G core network. Intent management lets an operator state a desired outcome for the network, which the system then translates into actions. The requirements mainly cover application scenarios, functional requirements, interface requirements and model requirements. It applies to intent management of the 5G core network.

Telecommunications operators, vendors of 5G core network equipment and management systems, and system integrators and test teams who work on network automation use it. The standard is voluntary, as the /T in its code shows. It was issued by the Ministry of Industry and Information Technology on 1 June 2026 and takes effect on 1 September 2026. It is a new standard, so no earlier edition is replaced.

Remaining clauses in the full document

  • 2 Normative references
  • 3 Terms and definitions

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 35 pages — is available in the English PDF.

How to Download YD/T 7010-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
35 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YD/T 7010-2026

$545.00