YD/T 5262-2023Signaling Monitoring System Engineering Technical Specifications (English PDF)
信令监测系统工程技术规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for YD/T 5262-2023 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Recommended
Issue date
April 21, 2023
Implementation date
August 1, 2023
Scope
YD/T 5262-2023 is the English-translated version of 信令监测系统工程技术规范.
YD/T 5262-2023 is the Chinese standard "Signaling Monitoring System Engineering Technical Specifications". This standard applies to operational signaling monitoring systems built by telecom operators and regulatory signaling monitoring systems built by government regulatory authorities.
The main content includes general requirements, system architecture, signaling collection and preprocessing, signaling monitoring platform, Network organization, system performance requirements, equipment configuration requirements, time synchronization, security requirements, project implementation and acceptance requirements, etc. It was issued by Ministry of Industry and Information Technology. Issued on 2023-04-21, in force from 2023-08-01.
Found what you need?
Document preview — YD/T 5262-2023
National Standard of the People's Republic of China
- ICS
- 33.040.40
- Classification
- L78
Issued by: Ministry of Industry and Information Technology
Contents
- [Preview only]
- 1 Scope
- 2 Normative references
- 3 Abbreviations
- 3.1 Terms and definitions
- 4 General
- 4.1 Test environment
- 4.2 UE Information
- 4.3 Test Implementation
- 5 Technical requirements
1 Foreword
YD/T 5262-2023 was issued by Ministry of Industry and Information Technology on 21 April 2023 and has been in force since 1 August 2023.
The YD/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
The document runs to 15 pages in English translation.
2 Scope Preview
This standard applies to operational signaling monitoring systems built by telecom operators and regulatory signaling monitoring systems built by government regulatory authorities. The main content includes general requirements, system architecture, signaling collection and preprocessing, signaling monitoring platform, Network organization, system performance requirements, equipment configuration requirements, time synchronization, security requirements, project implementation and acceptance requirements, etc.
YD/T 5262-2023 falls under ICS 33.040.40, in the field of telecommunications.
This catalogue holds 3,420 other YD/T standards in that field.
In this catalogue, YD/T standards carry edition years from 1982 to 2026.
3 About this standard
Sector: Telecommunication Industry Standard (Recommended)
Issued by: Ministry of Industry and Information Technology
English translation: about 15 pages (approximate)
4 Related standards
Standards on related subjects:
CJ/T 188-2018 — Technical requirements of utility meters data transmission
YDC 079-2009 — Technical Specifications and Testing Methods of Wireless LAN for Mobile Terminals
YD/T 5256-2023 — Wavelength Switched Optical Network (WSON) Engineering Specifications
YD/T 5253-2023 — Design specification for co-construction and sharing project of mobile communication system
YD/T 5252-2023 — Design specification for IP wide area network engineering based on SDN technology
5 Classification and status
International classification (ICS): 33.040.40
Chinese Standard Classification (CCS): L 78
Prefix YD/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
How to Download YD/T 5262-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
YD/T 1114-2026 — Halogen-free flame retardant optical fibre cable
YD/T 1181.1-2026 — Characteristics of non-metal reinforcement used for optical fiber cables - Part 1: Glass fiber reinforced plastic rods
YD/T 1181.3-2026 — Characteristics of non-metal reinforcement for optical fiber cables - Part 3: aramid fiber reinforced plastic rods
YD/T 5262-2023
$455.00