YD 5125-2014Communications equipment installation engineering construction supervision (English PDF)
通信设备安装工程施工监理规范
This is a limited preview
Buy now to download the full PDF (37 pages)
Need quotation for your management?
Get a formal quotation for YD 5125-2014 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Mandatory
Issue date
May 6, 2014
Implementation date
July 1, 2014
Scope
YD 5125-2014 is the English-translated version of 通信设备安装工程施工监理规范.
YD 5125-2014 — This Standard applies to construction supervision of new communications equipment installed for the expansion, renovation construction supervision may refer to this standard.
Found what you need?
Document preview — YD 5125-2014
National Standard of the People's Republic of China
- ICS
- 33.020
- Classification
- P 76
- Replacing
- YD 5125-2005
Issued by: Ministry of Industry and Information Technology
Contents
- What this standard covers1
- Document data2
What this standard covers
This Standard applies to construction supervision of new communications equipment installed for the expansion, renovation construction supervision may refer to this standard. The main contents include quality control communications equipment installation
Document data
International classification (ICS): 33.020.
Chinese classification (CCS): P76.
Estimated length of the Chinese original: 55,570 words.
Supersedes the earlier edition YD 5125-2005.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 37 pages — is available in the English PDF.
How to Download YD 5125-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
YD 5084.3-2015 — Specification for Seismic Test of Switching Equipment. Part 3: Mobile Communication Core Network Equipment
YD 5091.1-2015 — Specification for Seismic Test of Transmission Equipment. Part 1: Optical Transmission Equipment
YD 5133-2015 — Supervision Specifications for Mobile Communication Steel Tower and Mast Engineering
Secure payment via Stripe
Payments accepted
YD 5125-2014
$1,334.00