Scope

YC/T 12.2-1993 (Tobacco machinery. Products technological documentation. Part 2: Design of manufactring plan) is available as an English-translated PDF.

YC/T 12.2-1993 — This part of YC/T 12 specifies the design principles, design basis, classification, design content and design review of the tobacco mechanical product process plan.

Batch procedures, etc. This section applies to the design of the tobacco mechanical product process plan.

Found what you need?

Document preview — YC/T 12.2-1993

National Standard of the People's Republic of China

ICS
65.160
Classification
X 94
Replacing
YC/T 12.2-1993

Issued by: State Tobacco Monopoly Administration

Contents

  • Foreword
  • 1 Scope
  • 2 Terms and definitions
  • 3 Design principles
  • 4 Design basis
  • 5 Classification
  • 5.1 Prototype trial production process plan
  • 5.2 Small batch trial production process plan
  • 5.3 Formal production process plan

Foreword

YC/T 12 "Tobacco Machinery Product Process Document" is divided into the following sections.

--- Part 1. Integrity;

--- Part 2. Process design;

--- Part 3. Product structure process review;

--- Part 4. Process design;

--- Part 5. Process specification format;

--- Part 6. Management process file format;

--- Part 7. Numbering method;

--- Part 8. Process quota preparation;

--- Part 9. Change method.

This part is the second part of YC/T 12. This part replaces YC/T 12.2-1993 "Tobacco Machinery Product Process Document Process Design". The main changes in this section compared to YC/T 12.2-1993 are as follows.

--- canceled the "general requirements" (Chapter 3 of the 1993 edition);

--- Added "terms and definitions" (Chapter 3 of this edition).

This part is proposed by the National Tobacco Monopoly Bureau.

This part is under the jurisdiction of the National Tobacco Standardization Technical Committee (TC144).

This section drafted by. Changde Tobacco Machinery Co., Ltd., China Tobacco Machinery Technology Center Co., Ltd.

1 Scope

This part of YC/T 12 specifies the design principles, design basis, classification, design content and design review of the tobacco mechanical product process plan.

Batch procedures, etc.

This section applies to the design of the tobacco mechanical product process plan.

2 Terms and definitions

The following terms and definitions apply to this part of YC/T 12.

Classification of the degree of specialization of production (or workshop, section, team, work place). Generally divided into mass production, batch production and single piece Three types are produced.

[GB/T 4863-1985, definition 1.1.34]

3 Design principles

3.1 The design process plan should fully consider the production cycle, cost, environmental protection and flexible manufacturing technology while ensuring product quality.

3.2 The advanced technology and equipment at home and abroad should be actively adopted.

4 Design basis

The basis for the design of the process plan is as follows.

a) product drawings and related technical documents;

b) product production outline;

c) the type of production or stage of production of the product;

d) the existing production conditions of the enterprise;

e) Process technical information of similar products at home and abroad;

f) Relevant technical policies.

Note. The production stage refers to prototype production, small batch trial production and formal production.

5 Classification

5.1 Prototype trial production process plan

The prototype production process plan should be based on the evaluation of the product structure and processability, and propose various process technology preparations required for prototype production.

Guidance document for work, specific tasks and measures.

5.2 Small batch trial production process plan

The small batch trial production process plan should summarize the various process technology preparations required before the batch test on the basis of summarizing the prototype test work.

Guidance documents for physical tasks and measures.

5.3 Formal production process plan

The formal production process plan should be based on the summary of the small batch trial production situation, and propose the process that needs further improvement and improvement before mass production.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 5 pages — is available in the English PDF.

How to Download YC/T 12.2-1993

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
5 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YC/T 12.2-1993

$204.00