YB/T 6414-2025Threaded lifting loops with swaged termination (English PDF)
螺纹环眼压制吊具
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for YB/T 6414-2025 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Recommended
Issue date
December 17, 2025
Implementation date
July 1, 2026
Scope
YB/T 6414-2025 is the English-translated version of 螺纹环眼压制吊具.
YB/T 6414-2025 is the Chinese standard "Threaded lifting loops with swaged termination".
This standard specifies the terms and definitions, classification and marking, ordering contents, requirements, test methods, inspection rules, selection, use, inspection and scrapping, marking, packaging, storage, transportation, and quality certificates for threaded eyelet pressing lifting tools.
This standard applies to lifting tools for precast concrete components with external threads on steel joints, pressed with wire ropes of nominal diameter 6mm to 26mm and wire rope grade not exceeding 1960, and threaded eyelet lifting tools for other components.
This standard may also be used as a reference for eyelet lifting tools. It was issued by Ministry of Industry and Information Technology. Issued on 2025-12-17, in force from 2026-07-01.
Found what you need?
Document preview — YB/T 6414-2025
National Standard of the People's Republic of China
- ICS
- 77.140.65
- Classification
- H49
Issued by: Ministry of Industry and Information Technology
Contents
- [Preview only]
- 1 Scope
- 2 Normative References
- 2.1 Terms
- 3 Terms and Definitions
- 4 Order information
- 5 Test method
- 6 Technical requirements
- 7 Test methods
- 8 Inspection rules
1 Foreword
YB/T 6414-2025 was issued by Ministry of Industry and Information Technology on 17 December 2025 and has been in force since 1 July 2026.
The YB/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
The document runs to 15 pages in English translation.
2 Scope Preview
This standard specifies the terms and definitions, classification and marking, ordering contents, requirements, test methods, inspection rules, selection, use, inspection and scrapping, marking, packaging, storage, transportation, and quality certificates for threaded eyelet pressing lifting tools. This standard applies to lifting tools for precast concrete components with external threads on steel joints, pressed with wire ropes of nominal diameter 6mm to 26mm and wire rope grade not exceeding 1960, and threaded eyelet lifting tools for other components. This standard may also be used as a reference for eyelet lifting tools.
YB/T 6414-2025 falls under ICS 77.140.65, in the field of metallurgy.
This catalogue holds 971 other YB/T standards in that field.
In this catalogue, YB/T standards carry edition years from 1980 to 2026.
3 About this standard
Sector: Ferrous Metallurgy Industry Standard (Recommended)
Issued by: Ministry of Industry and Information Technology
English translation: about 15 pages (approximate)
4 Related standards
Standards on related subjects:
GB/T 5224-2023 — Steel strand for prestressed concrete
YB/T 5359-2020 — Compacted strand ropes
GB/T 5223-2014 — Steel wire for prestressing of concrete
YB/T 5294-2026 — Low carbon steel wire for general uses
YB/T 6409-2025 — Welding wire of high silicon stainless steel
5 Classification and status
International classification (ICS): 77.140.65
Chinese Standard Classification (CCS): H 49
Prefix YB/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
How to Download YB/T 6414-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
YB/T 036.1-2026 — General technical requirement for metallurgical equipment manufacturing - Part 1: Inspection and trst
YB/T 036.11-2026 — General technical requirements for metallurgical equipment manufacturing - Part 11: welding
YB/T 036.21-2026 — General technical requirement for metallurgical equipment manufacturing - Part 21: Packaging
YB/T 6414-2025
$345.00