Valid

YB/T 6328-2024Technical specification for safe operation and maintenance of buildings and structures in the metallurgical industry (English PDF)

冶金工业建构筑物安全运维技术规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (53 pages)

Need quotation for your management?

Get a formal quotation for YB/T 6328-2024 in 30 minutes.

Issued by

Ministry of Industry and Information Technology

Level / Type

National · Recommended

Issue date

March 29, 2024

Implementation date

October 1, 2024

Scope

YB/T 6328-2024 is the English-translated version of 冶金工业建构筑物安全运维技术规范.

YB/T 6328-2024 — Technical specification for safe operation and maintenance of buildings and structures in the metallurgical industry

Found what you need?

Document preview — YB/T 6328-2024

National Standard of the People's Republic of China

Issued by: Ministry of Industry and Information Technology

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This standard specifies the general principles, terms, basic regulations, safe use regulations, inspection, observation and testing and identification, technical status classification, structural monitoring, maintenance, archives, data and information management and related appendices.

Document data

Estimated length of the Chinese original: 79,794 words.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 53 pages — is available in the English PDF.

How to Download YB/T 6328-2024

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
53 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YB/T 6328-2024

$1,564.00