Valid

YB/T 2217-2018Dimensions of dome bricks (English PDF)

球顶耐火砖形状尺寸

Preview PDF

This is a limited preview

Buy now to download the full PDF (14 pages)

Need quotation for your management?

Get a formal quotation for YB/T 2217-2018 in 30 minutes.

Issued by

Ministry of Industry and Information Technology

Level / Type

National · Recommended

Issue date

February 9, 2018

Implementation date

July 1, 2018

Scope

YB/T 2217-2018 is the English-translated version of 球顶耐火砖形状尺寸.

YB/T 2217-2018 — Dimensions of dome bricks

Found what you need?

Document preview — YB/T 2217-2018

National Standard of the People's Republic of China

Classification
Q 40
Replacing
YB/T 2217-1999

Issued by: Ministry of Industry and Information Technology

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard specifies the terms and definitions of ball-top refractory bricks (or ball-bottom bricks), the size brick size representation method, the dimensional specification method, the size and size characteristics, and the ball top (or ball bottom) brick calculation method.

Document data

Chinese classification (CCS): Q40.

Estimated length of the Chinese original: 21,241 words.

Supersedes the earlier edition YB/T 2217-1999.

Standards quoted by this document

GB/T 2992.2; GB/T 8170

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 14 pages — is available in the English PDF.

How to Download YB/T 2217-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
14 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

YB/T 2217-2018

$474.00