Valid

XF/T 3019-2023Rules for fire safety management of large-scale commercial complexes (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for XF/T 3019-2023 in 30 minutes.

Issued by

Ministry of Emergency Management

Level / Type

National · Recommended

Issue date

July 19, 2023

Implementation date

October 19, 2023

Scope

XF/T 3019-2023 (Rules for fire safety management of large-scale commercial complexes) is available as an English-translated PDF.

XF/T 3019-2023 — This standard specifies the fire safety management requirements and measures for large commercial complexes. This standard applies to the fire safety management of large commercial complexes with a construction area of more than 50,000 m2 that have been built and put into use.

Found what you need?

Document preview — XF/T 3019-2023

National Standard of the People's Republic of China

ICS
C80

Issued by: Ministry of Emergency Management

Contents

  • [Preview only]
  • 1 Scope
  • 2 Normative References
  • 2.1 Terms
  • 3 Terms and Definitions
  • 4 Overview
  • 4.1 General requirements
  • 5 Technical Requirements
  • 6 Calibration conditions
  • 6.1 Environmental conditions
  • 6.2 Measurement standards and other equipment
  • 7 Calibration items and calibration methods
  • 7.1 Calibration Items
  • 7.2 Calibration method
  • 8 Expression of calibration results
  • 9 Recalibration interval

1 Foreword

XF/T 3019-2023 was issued by Ministry of Emergency Management on 19 July 2023 and has been in force since 19 October 2023.

The XF/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

The document runs to 20 pages in English translation.

2 Scope Preview

This standard specifies the fire safety management requirements and measures for large commercial complexes. This standard applies to the fire safety management of large commercial complexes with a construction area of more than 50,000 m2 that have been built and put into use. The fire safety management of commercial complexes with a construction area of less than 50,000 m2 can be implemented as a reference.

XF/T 3019-2023 carries no ICS number and no Chinese Standard Classification code.

This catalogue holds 49 other XF/T standards.

Of the 30 XF/T standards that do carry an ICS number, 30 (100%) fall under ICS 13, in the field of environment and health protection, safety.

3 About this standard

Issued by: Ministry of Emergency Management

English translation: about 20 pages

Chinese original: about 30,317 characters

4 Related standards

Standards on related subjects:

JB 2293-1978 — Wind tunnel test method of radiator of automobile and tractor

5 Classification and status

International classification (ICS): C80

Prefix XF/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

How to Download XF/T 3019-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

XF/T 3019-2023

$584.00