WJ 579-2008Measurement method of explosive delay time for fuze (English PDF)
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for WJ 579-2008 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Mandatory
Issue date
March 17, 2008
Implementation date
October 1, 2008
Scope
WJ 579-2008 (Measurement method of explosive delay time for fuze) is available as an English-translated PDF.
WJ 579-2008 — Measurement method of explosive delay time for fuze
Found what you need?
Document preview — WJ 579-2008
National Standard of the People's Republic of China
- Classification
- G 89
- Replacing
- WJ 579-1977
Issued by: Ministry of Industry and Information Technology
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the extension agencies gunpowder fuze delay time determined the basic principles, test conditions, test categories, test equipment, test procedures and test results processing. This standard applies to an extension of time 0. 001s ~ 100s range extension mechanism gunpowder fuse measuring time delays.
Document data
Chinese classification (CCS): G89.
Estimated length of the Chinese original: 9,919 words.
Supersedes the earlier edition WJ 579-1977.
Standards quoted by this document
GJB 102A-1998; WJ 233-1977
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
How to Download WJ 579-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
WJ 9065-2010 — Civil Explosives workplace hazard monitoring system set up requirements
WJ 2689-2008 — Measurement of delay time for fuze of warhead of series connection charge
WJ 2690-2008 — General specification for positioning, orientation and navigation system in vehicle
Secure payment via Stripe
Payments accepted
WJ 579-2008
$344.00