WJ 2699-2008Requirements of installation and test for tactical missile warhead and fuse (English PDF)
This is a limited preview
Buy now to download the full PDF (4 pages)
Need quotation for your management?
Get a formal quotation for WJ 2699-2008 in 30 minutes.
Issued by
Ministry of Industry and Information Technology
Level / Type
National · Mandatory
Issue date
March 17, 2008
Implementation date
October 1, 2008
Scope
WJ 2699-2008 (Requirements of installation and test for tactical missile warhead and fuse) is available as an English-translated PDF.
WJ 2699-2008 — This standard specifies the tactical missile warhead (warhead compartment), fuze (An executive agency) and installation of related cabin, tests basic requirements.
Found what you need?
Document preview — WJ 2699-2008
National Standard of the People's Republic of China
- Classification
- V 28
Issued by: Ministry of Industry and Information Technology
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the tactical missile warhead (warhead compartment), fuze (An executive agency) and installation of related cabin, tests basic requirements. This standard applies to tactical missile warhead (hereinafter referred to as the warhead) and fuse in the development, production and use during installation and testing.
Document data
Chinese classification (CCS): V28.
Estimated length of the Chinese original: 6,646 words.
Standards quoted by this document
GJB 1303-1991; GJB 2675-1996
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 4 pages — is available in the English PDF.
How to Download WJ 2699-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
WJ 9065-2010 — Civil Explosives workplace hazard monitoring system set up requirements
WJ 2689-2008 — Measurement of delay time for fuze of warhead of series connection charge
WJ 2690-2008 — General specification for positioning, orientation and navigation system in vehicle
Secure payment via Stripe
Payments accepted
WJ 2699-2008
$224.00