TZ 225-2008Passenger Dedicated Railway Communications Construction Technology Guide (English PDF)
客运专线铁路通信工程施工技术指南
This is a limited preview
Buy now to download the full PDF (77 pages)
Need quotation for your management?
Get a formal quotation for TZ 225-2008 in 30 minutes.
Issued by
Ministry of Agriculture of the People's Republic of China
Level / Type
National · Mandatory
Issue date
January 11, 2008
Implementation date
January 11, 2008
Scope
TZ 225-2008 is the English-translated version of 客运专线铁路通信工程施工技术指南.
TZ 225-2008 — This standard applies to the design speed of passenger trains to 200 ~ 250km/h, 300 ~ 350 km/h construction standard gauge railway passenger line communications engineering.
Found what you need?
Document preview — TZ 225-2008
National Standard of the People's Republic of China
Issued by: Ministry of Agriculture of the People's Republic of China
Contents
- [Preview only]
- 1 Scope
- 2 Normative References
- 2.1 Terms
- 3 Terms and Definitions
- 4 Overview
- 4.1 General requirements
- 5 Technical Requirements
- 6 Calibration conditions
- 6.1 Environmental conditions
- 6.2 Measurement standards and other equipment
- 7 Calibration items and calibration methods
- 7.1 Calibration Items
- 7.2 Calibration method
- 8 Expression of calibration results
- 9 Recalibration interval
1 Foreword
TZ 225-2008 was issued by Ministry of Agriculture of the People's Republic of China on 11 January 2008 and took effect the same day.
The document runs to 77 pages in English translation.
2 Scope Preview
This standard applies to the design speed of passenger trains to 200 ~ 250km/h, 300 ~ 350 km/h construction standard gauge railway passenger line communications engineering.
TZ 225-2008 carries no ICS number and no Chinese Standard Classification code.
This catalogue holds 13 other TZ standards.
Of the 5 TZ standards that do carry an ICS number, 4 (80%) fall under ICS 93, in the field of civil engineering.
3 About this standard
Issued by: Ministry of Agriculture of the People's Republic of China
English translation: about 77 pages
Chinese original: about 117,146 characters
4 Related standards
Standards on related subjects:
TZ 322-2010 — Railway Bridge Bored Pile Construction Technology Guide (with provisions stating)
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 77 pages — is available in the English PDF.
How to Download TZ 225-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TZ 322-2010 — Railway Bridge Bored Pile Construction Technology Guide (with provisions stating)
TZ 323-2010 — Railway Movable Module beam construction technique guide (with provisions stating)
TZ 324-2010 — Railway Prestressed Concrete Continuous Beam (Rigid) Cantilever Placement Technology Guide
TZ 225-2008
$2,393.00