TD/T 1042-2013Standardization of construction supervision for land consolidation and rehabilitation projects (English PDF)

土地整治工程施工监理规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (39 pages)

Need quotation for your management?

Get a formal quotation for TD/T 1042-2013 in 30 minutes.

Issued by

Ministry of Land and Resources of the People's Republic of China

Level / Type

National · Recommended

Issue date

October 12, 2013

Implementation date

December 1, 2013

Scope

TD/T 1042-2013 is the English-translated version of 土地整治工程施工监理规范.

TD/T 1042-2013 - This standard stipulates the construction supervision organization, supervision procedures, work content and results requirements of land remediation projects.

This standard is applicable to the construction supervision work of agricultural land remediation, undeveloped land development and natural disaster damage land reclamation project, other the construction supervision of the land remediation project can be implemented by reference.

Found what you need?

Document preview — TD/T 1042-2013

National Standard of the People's Republic of China

ICS
91.020
Classification
P50

Issued by: Ministry of Land and Resources of the People's Republic of China

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard is proposed and managed by the Ministry of Land and Resources of the People's Republic of China.

This standard was drafted. Land Remediation Center of the Ministry of Land and Resources.

1 Scope

This standard stipulates the construction supervision organization, supervision procedures, work content and results requirements of land remediation projects.

This standard is applicable to the construction supervision work of agricultural land remediation, undeveloped land development and natural disaster damage land reclamation project, other the construction supervision of the land remediation project can be implemented by reference.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB 50319 Construction Engineering Supervision Specification SL288 Hydraulic Engineering Construction Project Construction Supervision Specification

3 Terms and definitions

The following terms and definitions apply to this document.

Undertake unit undertakingunitoftheproject the project implementation approval unit determined by the project approval authority when the project plan is issued.

Supervisor unit

Established in accordance with the law and obtained the relevant industry engineering supervision qualification certificate, registered and filed in the land and resources management department, engaged in land rectification work the service organization of Cheng Supervision activities.

Construction unit contractorunit Signed a construction contract with the project undertaker, and implemented the enterprise legal person or its legal representative of the construction and warranty of the land remediation project.

Project supervision agency projectsupervisioninstitutions According to the supervision contract, the supervision unit shall be stationed at the project site to fully perform the organization of the supervision contract.

Chief engineer engineersupervisoryengineer Authorized by the legal representative of the supervision unit, responsible for the performance of the entrusted supervision contract, and supervising the work of the project supervision agency Cheng Shi.

Director of the engineering engineer representativepresentofchiefsupervisoryengineer with the consent of the legal representative of the supervision unit, the chief management engineer shall authorize in writing to perform some of his duties and powers on behalf of the chief management engineer.

Supervising engineer in the project supervision organization.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 39 pages — is available in the English PDF.

Referenced standards

How to Download TD/T 1042-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
39 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TD/T 1042-2013

$650.00