TD/T 1031.4-2011Regulation on compiling land reclamation plan. Part 4: Metal mine (English PDF)
This is a limited preview
Buy now to download the full PDF (7 pages)
Need quotation for your management?
Get a formal quotation for TD/T 1031.4-2011 in 30 minutes.
Issued by
Ministry of Land and Resources of the People's Republic of China
Level / Type
National · Recommended
Issue date
May 4, 2011
Implementation date
May 31, 2011
Scope
TD/T 1031.4-2011 (Regulation on compiling land reclamation plan. Part 4: Metal mine) is available as an English-translated PDF.
TD/T 1031.4-2011 — This standard specifies the damaged metal ore mining land reclamation program preparation general principles, procedures, methods, content, and results requirements.
Found what you need?
Document preview — TD/T 1031.4-2011
National Standard of the People's Republic of China
- ICS
- 91.020
- Classification
- P 50
Issued by: Ministry of Land and Resources of the People's Republic of China
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard specifies the damaged metal ore mining land reclamation program preparation general principles, procedures, methods, content, and results requirements. Nonmetal mining damaged land reclamation program preparation may refer to this part of the implementation.
Document data
International classification (ICS): 91.020.
Chinese classification (CCS): P50.
Estimated length of the Chinese original: 11,119 words.
Standards quoted by this document
GB 2715-2005; GB 15618-1995; GB 18598-2001; GB 18599-2001; GB 50421-2007; AQ 2006-2005; YSJ 019-1992; ZBJ 1-1990; TD/T 1031.1
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 7 pages — is available in the English PDF.
How to Download TD/T 1031.4-2011
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TD/T 1031.1-2011 — Regulation on Compiling Land Reclamation Plan. Part 1: General Rules
TD/T 1031.2-2011 — Regulation on compiling land reclamation plan. Part 2: Opencast coalmine
TD/T 1031.3-2011 — Regulation on compiling land reclamation. Part 3: Underground coalmine
Secure payment via Stripe
Payments accepted
TD/T 1031.4-2011
$274.00