TB/T 2101-2018Terminology for railway construction machinery (English PDF)
铁路施工机械词汇
This is a limited preview
Buy now to download the full PDF (13 pages)
Need quotation for your management?
Get a formal quotation for TB/T 2101-2018 in 30 minutes.
Issued by
National Railway Administration
Level / Type
National · Recommended
Issue date
December 20, 2018
Implementation date
July 1, 2019
Scope
TB/T 2101-2018 is the English-translated version of 铁路施工机械词汇.
TB/T 2101-2018 — This standard specifies the main terms and definitions of railway construction machinery. This standard applies to the design, manufacture, application, management, research and teaching of railway construction machinery.
Found what you need?
Document preview — TB/T 2101-2018
National Standard of the People's Republic of China
- ICS
- 45.120
- Classification
- S 19
- Replacing
- TB/T 2101-2004
Issued by: National Railway Administration
Contents
- What this standard covers1
- Document data2
What this standard covers
This standard specifies the main terms and definitions of railway construction machinery. This standard applies to the design, manufacture, application, management, research and teaching of railway construction machinery.
Document data
International classification (ICS): 45.120.
Chinese classification (CCS): S19.
Estimated length of the Chinese original: 20,285 words.
Supersedes the earlier edition TB/T 2101-2004.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.
How to Download TB/T 2101-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
TB/T 1679-2025 — Electrical graphic symbol for traction power supply system of electrified railway
TB/T 3162.3-2025 — Railway vehicle anti-runaway device - Part 3: Anti-runaway wheel shoes
TB/T 3188-2025 — Locomotive and Rolling Stock Operation Safety Monitoring System - Overall Technical Requirements
Secure payment via Stripe
Payments accepted
TB/T 2101-2018
$444.00