TB/T 1632.4-2014Welding of rails - Part 4: Gas pressure welding (English PDF)

Preview PDF

Also coversTBT1632.4-2014

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for TB/T 1632.4-2014 in 30 minutes.

Issued by

National Railway Administration of the People’s Republic of China

Level / Type

National · Recommended

Issue date

October 30, 2014

Implementation date

May 1, 2015

Scope

TB/T 1632.4-2014 (Welding of rails - Part 4: Gas pressure welding) is available as an English-translated PDF.

TB/T 1632.4-2014 — This Part of TB/T 1632 specifies the requirements, inspection methods and inspection rules for the gas pressure welding of rails. This Part is applicable to the gas pressure welding of 50 kg/m ~ 75 kg/m new rails.

Found what you need?

Document preview — TB/T 1632.4-2014

National Standard of the People's Republic of China

ICS
45.120
Classification
S 17

Issued by: National Railway Administration of the People’s Republic of China

Contents

  • Foreword...3
  • 1 Scope...5
  • 2 Normative references...5
  • 3 Requirements...5
  • 4 Inspection methods...11
  • 5 Inspection rules...14
  • Annex A (Informative) Gas pressure welding records of rails...19
  • Annex B (Normative) Records of weld fracture defects...20

Foreword

TB/T 1632 Welding of rails is divided into four parts.

— Part 1. General specification;

— Part 2. Flash butt welding;

— Part 3. Thermit welding;

— Part 4. Gas pressure welding.

This Part is Part 4 of TB/T 1632.

This Part was drafted in accordance with the provisions given in GB/T 1.1-2009.

This Part replaces TB/T 1632.4-2005 Welding of rails - Part 4. Gas pressure

welding. Compared with TB/T 1632.4-2005, the major technical changes are as

follows.

— MODIFY the equipment requirements for gas pressure welding (SEE 3.2

in this edition and 3.2 in 2005 edition);

— MODIFY the personnel requirements for gas pressure welding (SEE 3.3

in this edition and 3.3 in 2005 edition);

— MODIFY the process requirements (SEE 3.4 in this edition and 3.4 in

2005 edition);

— ADD the requirements for macroscopic inspection items; ADD the

requirements for 1 080MPa rail welded joints (SEE 3.5 in this edition and

3.5 in 2005 edition);

— MODIFY the requirements for hardness of welded joints (SEE 3.5 in this

edition and 3.5 in 2005 edition);

— MODIFY the inspection method (SEE Chapter 4 in this edition and

Chapter 4 in 2005 edition);

— MODIFY the inspection rules (SEE Chapter 5 in this edition and Chapter

5 in 2005 edition);

— MODIFY the Annex A, Gas pressure welding records of rails (SEE Annex

A in this edition and Annex A in 2005 edition);

— MODIFY the Annex B, Records of weld fracture defects (SEE Annex B in

this edition).

Welding of rails - Part 4. Gas pressure welding

1 Scope

This Part of TB/T 1632 specifies the requirements, inspection methods and

inspection rules for the gas pressure welding of rails.

This Part is applicable to the gas pressure welding of 50 kg/m ~ 75 kg/m new

rails.

2 Normative references

The following documents are essential to the application of this document. For

dated references, only the editions with the dates indicated are applicable to

this document. For undated references, only the latest editions (including all the

amendments) are applicable to this document.

GB/T 230.1-2009 Metallic materials - Rockwell hardness test - Part 1. Test

method (scales A, B, C, D, E, F, G, H, K, N, T)

GB/T 231.1-2009 Metallic materials - Brinell hardness test - Part 1. Test

method

GB/T 4340.1-2009 Metallic materials - Vickers hardness test - Part 1. Test

method

GB/T 6394 Metal - Methods for estimating the average grain size

GB/T 8170 Rules of rounding off for numerical values & expression and

judgement of limiting values

GB/T 13298 Inspection methods of microstructure for metals

TB/T 1632.1-2014 Welding of rails - Part 1. General specification

3 Requirements

3.1 Welding rail requirements

The rails for gas pressure welding shall meet the requirements of Chapter 4 in

TB/T 1632.1-2014.

3.2 Equipment and material requirements

3.2.1 Automated gas pressure welding equipment shall be adopted in

preference. In the welding process, it shall be able to automatically record the

change of parameters such as gas flow, rail-end pressure, etc. over time.

3.2.2 The purity of oxygen used for gas pressure welding of rails shall not be

less than 99.5%, while the purity of acetylene shall not be less than 98%.

3.3 Personnel requirements

Each welding operator shall hold a job training certificate issued by the technical

institution approved by the railway authority.

3.4 Process requirements

3.4.1 Welding environment requirements. The welding places shall have no

rain or heavy fog, at a temperature of not lower than 0°C. When the temperature

is below 0°C, measures of heat preservation shall be taken for the oxygen and

acetylene cylinders. Meanwhile, early drying shall be carried out within the

range of 400mm on each end face of the rails to be welded. Wind shall not be

greater than Level 5. In case of above Level 4, wind shielding measures shall

be taken.

3.4.2 POLISH the end faces of rails prior to welding. The allowable deviation

of the end face inclination shall be 0.2mm. SEE Figure 1.

3.4.3 For the alignment clamping operation of rails, alignment shall be based

on the working edges on the top of the rail and the side of the railhead.

3.4.4 The flame surface of the heater shall be parallel to the end face of the

rail.

3.4.5 The convex shearing process shall be carried out automatically. The

convex shearing process shall not cause damage to the joints and the rail

parent metal. After convex shearing, there shall be no macroscopic cracks on

or welding slag squeezed into the surfaces. The maximum convex shearing

allowance (the height of weld reinforcement after convex shearing) for each

part of the joint is as follows. 2mm for railhead; 2.5mm for railhead jaw; 2mm

for rail web; 1.5mm for rail flange.

reinforcement of the rail flange shall be under smooth transition. Longitudinal

grinding shall be carried out along the rails. It is not allowed to carry out

horizontal grinding. There shall be no grinding burn on the rail surfaces.

Misalignment in the vertical and horizontal directions on the non-working faces

of the welded joints shall be conducted with longitudinal grinding transition.

3.4.10 An imitation-type grinding machine shall be used to perform shape

finishing on the top surfaces of the rails and the working edges on the sides of

the railheads for the welded joints. Shape finishing shall maintain the contour

shape of railheads. The length of the shape finishing shall not exceed the limit

of 400mm on both sides of the weld center line. Shape finishing shall not cause

any mechanical or thermal damages to the welded joints or rails. Shape

finishing shall not be used correct the excessive flatness deviation and

excessive joint misalignment.

3.4.11 When a mobile gas pressure welding machine is used for CWR

(continuous welded rail) long rail welding, it shall be operated in coordination

with the CWR laying process. During locking welding, dwell convex shearing

shall be adopted. When the welded joints are cooled to below 300°C, it is

allowed to remove dwell pressure.

3.4.12 Mass production shall be carried out after passing the type inspection.

The production process shall be the same as the test specimens of the type

inspection.

3.4.13 The welded joints (finished products) of each rail shall be marked. The

markings shall be located on the same side of rail web of the welded long rails,

1m to 3m away from the welds. In addition, the markings shall be clear, upright

and identifiable for at least 5 years (or 1 overhaul cycle). The marking method

shall ensure that the welded joints (finished products) of each rail are traceable

based on the record sheet.

3.4.14 After welding, the following information shall be recorded (REFER to

Annex A).

a) rail markings, laying positions and welded joint markings;

b) environmental conditions (including temperature, wind, precipitation and

measures taken);

c) model of the welding machine;

d) welding and normalizing processes (including welding pressure, oxygen

and acetylene flow, heating time, swing frequency and width of the heater);

e) quality inspection and flaw detection results after welding;

f) welding operation group;

g) names of welders and inspectors;

...

......

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Referenced standards

How to Download TB/T 1632.4-2014

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TB/T 1632.4-2014

$110.00