Obsolete

TB 10218-1999Specification for non-destructive testing of railway piles (English PDF)

铁路工程基桩无损检测规程

Preview PDF

TB 10218 | Evolution and historical versions

Std IDTitleStatus
TB 10218-2019Technical specification for testing of railway pilesObsolete
TB 10218-2008Technical specification for test of railway pilesObsolete
TB 10218-1999Specification for non-destructive testing of railway pilesObsolete

TB 10218-1999 is obsolete. It has been replaced by TB 10218-2008. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for TB 10218-1999 in 30 minutes.

Issued by

Ministry of Railways

Level / Type

National · Mandatory

Issue date

March 2, 1999

Implementation date

June 1, 1999

Scope

TB 10218-1999 is the English-translated version of 铁路工程基桩无损检测规程.

TB 10218-1999 is the Chinese industry standard "Specification for non-destructive testing of railway piles". It was issued on March 2, 1999 by the Ministry of Railways, and took effect on June 1, 1999. It is obsolete: it has been replaced by TB 10218-2008.

Found what you need?

Document preview — TB 10218-1999

National Standard of the People's Republic of China

Issued by: Ministry of Railways

Contents

  • Document data
1 Document data

Sector: Railway (industry standard).

Issuing body: Ministry of Railways.

Date of issue: 1999-03-02.

Date of implementation: 1999-06-01.

Status: obsolete, replaced by TB 10218-2008.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download TB 10218-1999

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TB 10218-1999

$355.00