Withdrawn

TB 10108-2002Code for shotcrete-bolt construction method of railway tunnel (English PDF)

铁路隧道喷锚构筑法技术规范

Preview PDF

TB 10108 | Evolution and historical versions

Std IDTitleStatus
TB 10108-2002Code for shotcrete-bolt construction method of railway tunnelObsolete

TB 10108-2002 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for TB 10108-2002 in 30 minutes.

Issued by

Ministry of Railways of the People's Republic of China

Level / Type

National · Mandatory

Issue date

March 16, 2002

Implementation date

July 1, 2002

Scope

TB 10108-2002 is the English-translated version of 铁路隧道喷锚构筑法技术规范.

TB 10108-2002 is the Chinese industry standard "Code for shotcrete-bolt construction method of railway tunnel". It was issued on March 16, 2002 by the Ministry of Railways of the People's Republic of China, and took effect on July 1, 2002. It is obsolete: it has been withdrawn (abolished on February 25, 2009).

Found what you need?

Document preview — TB 10108-2002

National Standard of the People's Republic of China

Issued by: Ministry of Railways of the People's Republic of China

Contents

  • Document data
1 Document data

Sector: Railway (industry standard).

Issuing body: Ministry of Railways of the People's Republic of China.

Date of issue: 2002-03-16.

Date of implementation: 2002-07-01.

Status: obsolete, withdrawn on 2009-02-25.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download TB 10108-2002

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

TB 10108-2002

$1,170.00