Scope

T/CSAE 61-2017 is the English-translated version of 电池系统测试规范.

T/CSAE 61-2017 — This standard specifies the testing items, testing procedures, test methods and testing procedures for the next-generation lithium-ion battery system for pure electric cars (hereinafter referred to as the battery system) to guide the detection of the battery system for the next generation of pure electric cars.

It provides the basis for the selection and rapid evaluation of the power battery for the next generation of pure electric cars and the design of the battery system.

Found what you need?

Document preview — T/CSAE 61-2017

National Standard of the People's Republic of China

ICS
43.120
Classification
T 47

Issued by: China Society of Automotive Engineers

Contents

  • Foreword
  • 3.3 Battery pack battery pack
  • 3.4 Battery system battery system
  • 3.5 Energy battery high energy density battery
  • 3.6 Insulation resistance
  • 3.7 Rated capacity rated capacity
  • 3.8 Actual capacity
  • 3.9 Initial capacity initial actual capacity
  • 3.10 Capacity recovery capacity recovery
  • 3.11 Charge termination current end-of-charge current
  • 3.12 Explosion
  • 3.13 Fire
  • 3.14 Leakage
  • 3.15 Sweep cycle sweep cycle
  • 4 Symbol
  • 5 Test equipment and test conditions
  • 5.1 Environmental conditions
  • 5.2 Measuring instrument and meter accuracy
  • 5.3 Environmental adaptation
  • 8 Standard Cycle 6.2 RT
  • 9 Environmental adaptation 5.3 0 °C
  • 11 Environmental Adaptation 5.3 RT
  • 12 Standard charging 6.2 b) RT
  • 13 Standard Cycle 6.2 RT
  • 14 Environmental adaptation 5.3 0 °C
  • 15 Imax discharge 7.1.1.3 0 °C
  • 16 Environmental Adaptation 5.3 RT
  • 17 Standard charging 6.2 b) RT
  • 18 Standard Cycle 6.2 RT
  • 19 Environmental adaptation 5.3 -20 °C
  • 21 Environmental Adaptation 5.3 RT
  • 22 Standard charging 6.2 b) RT
  • 23 Standard Cycle 6.2 RT
  • 24 Environmental adaptation 5.3 -20 °C
  • 26 Environmental Adaptation 5.3 RT
  • 27 Standard charging 6.2 b) RT
  • 28 Standard Cycle 6.2 RT
  • 29 Environmental adaptation 5.3 -20 °C
  • 30 Imax discharge 7.1.1.3 -20 °C

Foreword

This specification was drafted in accordance with the rules given in GB/T 1.1-2009.

3.3 Battery pack battery pack

Multiple battery cells (or battery modules), battery management modules, battery boxes, and corresponding accessories are organically combined A unit that obtains electrical energy and can output electrical energy to the outside, referred to as a battery pack.

3.4 Battery system battery system

One or more battery packs (or battery modules) and corresponding accessories (battery management system, high voltage circuit, low voltage circuit, heat the management equipment and the mechanical assembly constitute a system for supplying electric energy to the entire electric vehicle.

3.5 Energy battery high energy density battery

It is characterized by high energy density and is mainly used for power batteries with high energy output.

3.6 Insulation resistance

The resistance between the power battery terminal and the metal case, battery case or body.

3.7 Rated capacity rated capacity

The C1 Ah value of the power battery provided by the company at 25 °C ± 2 °C.

3.8 Actual capacity

The average value of the experimental data of the "25 °C discharge capacity" of the power battery for three consecutive times (the difference between the maximum and minimum values of the three discharge capacities) the difference is less than 3% of the rated capacity).

3.9 Initial capacity initial actual capacity

The actual capacity Ah value of the new power battery.

3.10 Capacity recovery capacity recovery

After the power battery is stored at a certain temperature for a certain period of time, it is fully charged, and then the ratio of the discharge capacity to the initial capacity.

3.11 Charge termination current end-of-charge current

When performing constant voltage charging, the power battery terminates the current when charging.

3.12 Explosion

The power battery case is violently broken and the main component (solid matter) is ejected.

1706241-Battery system test specification.indd 2.2017/9/14 10.01.55

3.13 Fire

Any part of the power battery emits an open flame (lasting longer than 1 s), and sparks and arcs are not open flames.

3.14 Leakage

The internal liquid of the power battery leaks to the outside of the battery case.

3.15 Sweep cycle sweep cycle

Scan back and forth within the specified frequency range, for example. 10 Hz to 55 Hz to 10 Hz.

4 Symbol

C1-1 h rate rated capacity (Ah).

I1-1 h rate discharge current, the value is equal to C1 (A).

RT. room temperature (25 ± 2) ° C SOC. state of charge I'max. maximum allowable pulse discharge current Imax. maximum allowable continuous discharge current

5 Test equipment and test conditions

5.1 Environmental conditions

The room temperature environment requires a temperature of 25 °C ± 2 °C; other test environments require a temperature of 15 °C ~ 35 °C, relative humidity of 25% ~ 85%, atmospheric pressure is 86 kPa to 106 kPa.

5.2 Measuring instrument and meter accuracy

Voltage measuring device. accuracy is not less than 0.5, and its input impedance is at least 1 kohm/V;

Current measuring device. accuracy is not less than 0.5;

Temperature measuring device. with appropriate range, the division value is not more than 1 °C, the calibration accuracy is not lower than 0.5 °C;

Timer. index by time, minute and second, with an accuracy of ±0.1%;

Measuring tool for measuring size. the division value is not more than 1 mm;

Scale weighing instrument. Accuracy is ±0.05% or more.

Insulation resistance meter. accuracy is not less than 5%.

5.3 Environmental adaptation

When the target ambient temperature of the test changes, the test device needs to complete the environmental adaptation process before the test. static at low temperature Set for not less than 24 h; stand at high temperature for not less than 16 h; or the difference between the cell temperature and the target ambient temperature does not exceed 2 °C. Test If the device contains a battery control unit, the environmental adaptation process needs to be turned off.

1706241-Battery system test specification.indd 3.2017/9/14 10.01.55 1706241-Battery system test specification.indd 4.2017/9/14 10.01.55 1706241-Battery system test specification.indd 5.2017/9/14 10.01.55 Serial number battery system state test method chapter number ambient temperature

8 Standard Cycle 6.2 RT

9 Environmental adaptation 5.3 0 °C

10.1C1 Discharge 7.1.1.3 0 °C

11 Environmental Adaptation 5.3 RT

12 Standard charging 6.2 b) RT

13 Standard Cycle 6.2 RT

14 Environmental adaptation 5.3 0 °C

15 Imax discharge 7.1.1.3 0 °C

16 Environmental Adaptation 5.3 RT

17 Standard charging 6.2 b) RT

18 Standard Cycle 6.2 RT

19 Environmental adaptation 5.3 -20 °C

20.1/3C discharge 7.1.1.3 -20 °C

21 Environmental Adaptation 5.3 RT

22 Standard charging 6.2 b) RT

23 Standard Cycle 6.2 RT

24 Environmental adaptation 5.3 -20 °C

25.1C1 Discharge 7.1.1.3 -20 °C

26 Environmental Adaptation 5.3 RT

27 Standard charging 6.2 b) RT

28 Standard Cycle 6.2 RT

29 Environmental adaptation 5.3 -20 °C

30 Imax discharge 7.1.1.3 -20 °C

7.2 Power and internal resistance test

7.2.1 General conditions

7.2.1.1 The battery system needs to test the power and internal resistance at room temperature, high temperature and low temperature and different SOC, a specific ambient temperature and the power and internal resistance test conditions under SOC are given in 7.2.2, and the entire test process is carried out in accordance with 7.2.4.

7.2.1.2 Measure the terminal voltage of the battery system according to the time given in Table 5. Calculate the charge and discharge power and internal resistance according to 7.2.4.

7.2.2 Power and internal resistance test conditions

7.2.2.1 Power and internal resistance test conditions are carried out according to Table 4 and Figure 1. The data to be recorded during the test are shown in Table 5 and Figure 2.

7.2.2.2 The discharge current during the discharge process is kept at a constant current, and the current is the maximum allowable pulse discharge current I'max of the battery system. Do not I'max can be different from ambient temperature and SOC, and I'max is provided by the supplier. If the battery system terminal voltage or cell voltage during discharge the discharge voltage limit specified by the supplier is reached, the discharge is stopped, and the test is repeated after the I'max is appropriately lowered.

7.2.2.3 Charging process The charging current is kept at a constant current with a current of 0.75I'max. If the maximum allowable pulse charge of the battery system

Table 3 Energy and capacity test steps at low temperatures (continued)

1706241-Battery system test specification.indd 6.2017/9/14 10.01.55 1706241-Battery system test specification.indd 7.2017/9/14 10.01.55 1706241-Battery system test specification.indd 8.2017/9/14 10.01.56 1706241-Battery system test specification.indd 9.2017/9/14 10.01.56 10s charging power P10s, cha=U15×I15 (30) 20s charging power P20s, cha=U16×I16 (31) Open circuit voltage UOCV=U17 (32)

7.2.4 Test procedure the power and internal resistance tests at room temperature, high temperature and low temperature are carried out according to Tables 6, 7, and 8, respectively, in which the tests at high temperature and low temperature are performed.

Conducted in the environmental box.

Table 6 Battery system power and internal resistance test test steps at room temperature

Serial number battery system state test method chapter number ambient temperature 1. Environmental Adaptation 5.3 RT 2. Standard charging 6.1.1 b) RT 3. Standard Cycle 6.2 RT 4. Power and internal resistance test conditions 7.2.2 RT

Table 7 Battery system power and internal resistance test test steps at high temperature

Serial number battery system state test method chapter number ambient temperature 1. Environmental Adaptation 5.3 RT 2. Standard charging 6.2.1 b) RT 3. Standard Cycle 6.2 RT 4. Environmental adaptation 5.3 40 °C 5. Power and internal resistance test conditions 7.2.2 40 °C

Table 8 Battery system power and internal resistance test test steps at low temperature

Serial number battery system state test method chapter number ambient temperature 1. Environmental Adaptation 5.3 RT 2. Standard charging 6.2.1 b) RT 3. Standard Cycle 6.2 RT 4. Environmental adaptation 5.3 -20 °C 5. Power and internal resistance test conditions 7.2.2 -20 °C

7.3 No load capacity loss

7.3.1 No-load capacity loss refers to the capacity loss of the battery system in the long-term suspension state. Test at room temperature according to Tables 9 and 10 get on.

7.3.2 No load capacity loss The battery management system is in operation during the test.

7.3.3 The SOC of the battery system under test in the no-load capacity loss test is 100%.

7.3.4 No load capacity loss measured at two different temperatures, room temperature and 40 °C.

7.3.5 The test period is 720 h (30 days).

7.3.6 After the end of the hold, the unloaded capacity retention rate and capacity recovery rate are determined by 1C1.

1706241-Battery system test specification.indd 10.2017/9/14 10.01.56

Table 9 Test procedure for no-load capacity loss of battery system at room temperature

Serial number battery system state test method chapter number ambient temperature 1. Environmental Adaptation 5.3 RT 2. Standard charging 6.2.1 b) RT 3. Standard Cycle 6.2 RT 4. Shelving 720 h 7.3.2 RT 5. Standard discharge 6.2.1 a) RT 6. Standard Cycle 6.2 RT

Table 10 Test procedure for no load capacity loss of battery system at 40 ° C

Serial number battery system state test method chapter number ambient temperature 1. Environmental Adaptation 5.3 RT 2. Standard charging 6.2.1 b) RT 3. Standard Cycle 6.2 RT 4. Shelving 720 h 7.3.2 40 °C 5. Environmental Adaptation 5.3 RT 6. Standard discharge 6.2.1 a) RT 7. Standard Cycle 6.2 RT

7.4 Capacity loss in storage

7.4.1 Capacity loss in storage refers to the capacity loss of the battery system in the long-term storage state. The test was carried out at room temperature according to Table 11.

7.4.2 Disconnect the high voltage connection, low voltage connection of the battery system, shut down the cooling system and other necessary connecting devices during the shelving process.

7.4.3 During the shelving process, the SOC of the battery system is 50% (or agreed between the supplier and the customer).

7.4.4 The shelf temperature is 45 °C.

7.4.5 The hold period is 720 h.

7.4.6 At the end of the hold, test the capacity retention rate and capacity recovery rate of the battery system.

Table 11 Capacity Loss Test Procedure in Battery System Storage

Serial number battery system state test method chapter number ambient temperature 1. Environmental Adaptation 5.3 RT 2. Standard charging 6.2.1 b) RT 3. Standard Cycle 6.2 RT 4.1C1 Discharge, adjust capacity to 50% 6.2.1 a) RT 5. Shelving 720 h 7.3.2 45 °C 6. Environmental Adaptation 5.3 RT 7.1C1 discharge 6.2.1 a) RT 8. Standard charging 6.2.1 b) RT 9. Standard Cycle 6.2 RT 1706241-Battery system test specification.indd 11.2017/9/14 10.01.56 1706241-Battery system test specification.indd 12.2017/9/14 10.01.56 1706241-Battery system test specification.indd 13.2017/9/14 10.01.56

Table 14 Z-axis PSD values

frequency

Power spectral density (PSD) G2/Hz Power spectral density (PSD) (m/s2) 2/Hz 5 0.05 4.81 10 0.06 5.77 20 0.06 5.77 200 0.0008 0.08 RMS 1.44 g 14.13 m/s2

Table 15 Y-axis PSD values

frequency

Power spectral density (PSD) G2/Hz Power spectral density (PSD) (m/s2) 2/Hz 5 0.04 3.85 20 0.04 3.85 200 0.0008 0.08 RMS 1.23 g 12.07 m/s2 Note. The battery pack or battery system is mounted on the body

Table 16 Y-axis PSD values

frequency

Power spectral density (PSD) G2/Hz Power spectral density (PSD) (m/s2) 2/Hz 5 0.01 0.96 10 0.015 1.44 20 0.015 1.44 50 0.01 0.96 200 0.0004 0.04 RMS 0.95 g 9.32 m/s2 Note. The battery pack or battery system is installed under the body

Table 17 X-axis PSD values

frequency

Power spectral density (PSD) G2/Hz Power spectral density (PSD) (m/s2) 2/Hz 5 0.0125 1.20 10 0.03 2.89 20 0.03 2.89 200 0.00025 0.02 RMS 0.96 g 9.42 m/s2 1706241-Battery system test specification.indd 14.2017/9/14 10.01.56 Y1 Y2 0.1 9.62 0.962 0.0962 0.00962 0.01 0.001 0.0001 Description.

X - frequency (Hz); 1--horizontal vertical PSD X;

Y1--power spectral density (g2/Hz); 2--horizontal lateral PSD Y;

Y2--power spectral density (PSD) [(m/s2) 2/Hz]; 3-- horizontal PSD Y;

4--longitudinal PSD Z;

Figure 3 Vibration test power spectral density curve of battery system

Table 18 Test time and temperature for different test device quantities

Test time for different number of devices under test Ambient temperature 0 0 0 RT 105 75 60 Tmin 420 300 240 Tmin 525 375 300 RT 700 500 400 Tmax 1085 775 620 Tmax 1260 900 720 RT sum=21h sum=15h sum=12h/

8.2 Mechanical shock

8.2.1 Before the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.2.2 Apply a 25 g, 15 ms half sinusoidal impact waveform to the battery system, and impact 3 times in the Z-axis direction for 2 h.

8.2.3 Requirements. The battery system has no leakage, cracked casing, fire, or explosion. After the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.3 Drop

8.3.1 Before the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.3.2 The battery system is free to fall from the height of 1 m to the concrete floor in the direction of the most likely fall during actual maintenance or installation.

On the surface, observe for 2 h.

8.3.3 Requirements. The battery system has no electrolyte leakage, fire, or explosion.

1706241-Battery system test specification.indd 15.2017/9/14 10.01.57 1706241-Battery system test specification.indd 16.2017/9/14 10.01.57 1706241-Battery system test specification.indd 17.2017/9/14 10.01.57 8.9 seawater immersion

8.9.1 Before the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.9.2 Place the fully charged battery system in the actual vehicle assembly direction in 3.5% NaCl brine for 2 h at room temperature. Water depth is sufficient Submerged the battery system under test. Observe for 2 h.

8.9.3 Requirements. The battery system has no shell rupture, fire, or explosion.

8.10 External fire

8.10.1 Before the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.10.2 The test gasoline quantity is at least 60 L, and the flat disk size of the gasoline is more than 20 cm of the test object horizontal size, no more than 50 cm. The flat plate height is no more than 8 cm above the surface of the gasoline. The bottom of the flat plate is filled with water.

8.10.3 Ignite the fuel at least 3 m away from the device under test. After 60 seconds of warm-up, place the oil pan under the device under test.

If the oil pan size is too large, you can use the method of moving the device under test and the stand.

8.10.4 The sample to be tested is directly exposed to the flame for 70 seconds.

8.10.5 Cover the cover on the oil pan. The sample to be tested was tested in this state for 60 seconds. Or continue to directly leak through the agreement of both parties in the flame for 60 seconds.

8.10.6 Remove the oil pan and observe for 2 h.

8.10.7 Requirements. The battery system has no explosion.

8.11 Over temperature protection

8.11.1 Before the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.11.2 The test temperature is the highest working temperature of the test object, and the charge and discharge test is performed with the maximum continuous charge and discharge current allowed by the test object.

Check until the management system is active, or the cell temperature changes less than 4 °C within 2 h.

8.11.3 Requirements. The battery system has no air jets, cracked casing, fire, or explosion. After the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.12 Short circuit protection

8.12.1 All control systems in the battery system are in operation during the test.

8.12.2 Before the test, when the insulation resistance test is performed, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.12.3 Short circuit the battery system terminals for 10 min.

8.12.4 The short-circuit resistance is not more than 20 mohm or is mutually agreed by both parties. Observe for 2 h.

8.12.5 Requirements. The battery management system works, and the battery system has no leakage, cracked casing, fire, or explosion. After the test, when performing the insulation resistance test, the AC resistance value is not less than 500 ohm/V, or the DC resistance value is not less than 100 ohm/V.

8.13 Overcharge protection

8.13.1 All control systems in the battery system during testing...

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.

How to Download T/CSAE 61-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
19 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

T/CSAE 61-2017

$530.00