SY/T 6915.3-2019Petroleum and natural gas drilling and production equipment Flow control system for eccentric working cylinder Part 3: Delivery head, salvage head, fishing device and positioning locking mechanism (English PDF)
石油天然气钻采设备 偏心工作筒流量控制系统 第3部分:偏心工作筒用投送头、打捞头、投捞器及定位锁紧机构
This is a limited preview
Buy now to download the full PDF (26 pages)
Need quotation for your management?
Get a formal quotation for SY/T 6915.3-2019 in 30 minutes.
Issued by
National Energy Administration
Level / Type
National · Recommended
Issue date
January 1, 2019
Implementation date
May 1, 2020
Scope
SY/T 6915.3-2019 is the English-translated version of 石油天然气钻采设备 偏心工作筒流量控制系统 第3部分:偏心工作筒用投送头、打捞头、投捞器及定位锁紧机构.
SY/T 6915.3-2019 is the Chinese standard "Petroleum and natural gas drilling and production equipment Flow control system for eccentric working cylinder Part 3: Delivery head, salvage head, fishing device and positioning locking mechanism". It was issued by National Energy Administration.
Found what you need?
Document preview — SY/T 6915.3-2019
National Standard of the People's Republic of China
- ICS
- 75.180.10
- Classification
- E92
Issued by: National Energy Administration
Contents
- [Preview only]
- 1 Scope
- 1.2 Definition of terms
- 2 Normative references
- 2.1 General requirements
- 2.2 Pressure-drop limitations and piping configurations
- 2.3 Inlet stresses that originate from static loads in the discharge piping
- 2.4 Inlet stresses that originate from discharge reaction forces
- 2.5 Isolation valves in inlet piping
- 2.6 Rupture disk devices in combination with pressure relief valves
- 2.7 Process laterals connected to inlet piping of pressure relief valves
- 2.8 Turbulence in pressure relief device inlets
- 3 Terms and definitions
- 3.2 Safe disposal of relieving fluids
- 3.3 Back pressure limitations and sizing of pipe
- 3.4 Considerations for pilot-operated pressure relief valves
- 3.5 Stresses that originate from discharge piping
- 3.6 Isolation valves in the discharge piping
- 4 Isolation valves in pressure relief piping
- 4.1 Determination of relief requirements
- 4.2 Relieving pressure
- 4.3 Sizing for gas or vapor relief
- 4.4 Examples of isolation valve installations
- 4.5 Sizing for liquid relief: relief valves requiring liquid capacity certification
- 4.6 Sizing for liquid relief: relief valves not requiring liquid capacity certification
- 4.7 Sizing for two-phase liquid/vapor relief
- 4.8 Sizing for rupture disk devices
- 5 Bonnet or pilot vent piping
- 5.1 Conventional pressure relief valves
- 5.2 Balanced bellows pressure relief valves
- 5.3 Balanced piston pressure relief valve
- 5.4 Pilot-operated pressure relief valves
- 5.5 Thickness calculation of planar insulation layer
- 6 Drain piping
- 6.1 Installation conditions that require drain piping
- 6.2 Safe practice for installation of drain piping
- 6.3 SPM Location and Spatial Requirements
- 6.4 Other materials
- 6.5 Transportation, storage and custody of materials
- 7 Pressure relief device location and position
- 7.1 Inspection and maintenance
- 7.2 Proximity to pressure source
- 7.3 Proximity to other equipment
- 7.4 Mounting position
- 7.5 Test or lifting levers
- 7.6 Heat tracing and insulation
- 8 Bolting and gasketing
- 8.1 Care in installation
- 8.2 Proper gasketing and bolting for service requirements
- 8.3 Welding
- 8.4 Quality Control and Inspection
- 9 Multiple pressure relief valves with staggered settings
- 9.2 Installation of Mooring Foundation
- 9.3 Laying of Mooring Lines
- 9.4 Hook-up of Mooring Lines
1 Foreword
SY/T 6915.3-2019 was issued by National Energy Administration on 4 November 2019 and has been in force since 1 May 2020.
It is one of 4 parts of the SY/T 6915 series.
The SY/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
2 Scope Preview
SY/T 6915.3-2019 falls under ICS 75.180.10, in the field of petroleum and related technologies.
This catalogue holds 482 other SY/T standards in that field.
In this catalogue, SY/T standards carry edition years from 1973 to 2025.
3 About this standard
Sector: Oil & Gas Industry Standard (Recommended)
Issued by: National Energy Administration
English translation: about 26 pages (approximate)
Chinese original: about 38,343 characters
4 Related standards
Other parts of this standard:
SY/T 6915.1-2012 — Petroleum and natural gas industries. Drilling and production equipment. Part 1: Side-pocket mandrel
SY/T 6915.2-2017 — Petroleum and natural gas drilling and production equipment-. Flow control systems for side-pocket mandrel. Part 2: Flow-control device for side-pocket mandrels
SY/T 6915.4-2020 — Petroleum and natural gas drilling equipment. Eccentric working cylinder flow control system - Part 4: Operating regulations for eccentric working cylinder and related equipment
Standards on related subjects:
SY/T 5164-2016 — Roller cone drill bits
SY/T 5324-2013 — Pre-Stress Insulated Tubing
SY 0007-1999 — Design standard of corrosion control for steel pipeline and storage tank
5 Classification and status
International classification (ICS): 75.180.10
Chinese Standard Classification (CCS): E 92
Prefix SY/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.
How to Download SY/T 6915.3-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SY/T 6915.4-2020 — Petroleum and natural gas drilling equipment. Eccentric working cylinder flow control system - Part 4: Operating regulations for eccentric working cylinder and related equipment
SY/T 6915.2-2017 — Petroleum and natural gas drilling and production equipment-. Flow control systems for side-pocket mandrel. Part 2: Flow-control device for side-pocket mandrels
SY/T 6915.1-2012 — Petroleum and natural gas industries. Drilling and production equipment. Part 1: Side-pocket mandrel
SY/T 6915.3-2019
$600.00