Valid

SY/T 6636-2005Specification for electric motor prime mover for beam unit service (English PDF)

游梁式抽油机用电动机规范

Preview PDF

This is a limited preview

Buy now to download the full PDF (9 pages)

Need quotation for your management?

Get a formal quotation for SY/T 6636-2005 in 30 minutes.

Issued by

National Energy Administration

Level / Type

National · Recommended

Issue date

July 26, 2005

Implementation date

November 1, 2005

Scope

SY/T 6636-2005 is the English-translated version of 游梁式抽油机用电动机规范.

SY/T 6636-2005 is the Chinese standard "Specification for electric motor prime mover for beam unit service". This standard applies to power of 150kW (200hp) and below the beam pumping unit with a multi-phase squirrel cage induction motors.

This standard includes a user motor data sheet (see Appendix A) and an electric motor performance data required format (see Appendix B). Use of variable frequency power supply, and other motor speed is not within the scope of this standard, to be considered separately in order to obtain satisfactory performance. Issued on 2005-07-26, in force from 2005-11-01.

Found what you need?

Document preview — SY/T 6636-2005

National Standard of the People's Republic of China

ICS
75.180.10
Classification
E92

Contents

  • [Preview only]
  • 1 Scope
  • 1.2 Definition of terms
  • 2 Normative references
  • 2.1 General requirements
  • 2.2 Pressure-drop limitations and piping configurations
  • 2.3 Inlet stresses that originate from static loads in the discharge piping
  • 2.4 Inlet stresses that originate from discharge reaction forces
  • 2.5 Isolation valves in inlet piping
  • 2.6 Rupture disk devices in combination with pressure relief valves
  • 2.7 Process laterals connected to inlet piping of pressure relief valves
  • 2.8 Turbulence in pressure relief device inlets
  • 3 Terms and definitions
  • 3.2 Safe disposal of relieving fluids
  • 3.3 Back pressure limitations and sizing of pipe
  • 3.4 Considerations for pilot-operated pressure relief valves
  • 3.5 Stresses that originate from discharge piping
  • 3.6 Isolation valves in the discharge piping
  • 4 Isolation valves in pressure relief piping
  • 4.1 Determination of relief requirements
  • 4.2 Relieving pressure
  • 4.3 Sizing for gas or vapor relief
  • 4.4 Examples of isolation valve installations
  • 4.5 Sizing for liquid relief: relief valves requiring liquid capacity certification
  • 4.6 Sizing for liquid relief: relief valves not requiring liquid capacity certification
  • 4.7 Sizing for two-phase liquid/vapor relief
  • 4.8 Sizing for rupture disk devices
  • 5 Bonnet or pilot vent piping
  • 5.1 Conventional pressure relief valves
  • 5.2 Balanced bellows pressure relief valves
  • 5.3 Balanced piston pressure relief valve
  • 5.4 Pilot-operated pressure relief valves
  • 5.5 Thickness calculation of planar insulation layer
  • 6 Drain piping
  • 6.1 Installation conditions that require drain piping
  • 6.2 Safe practice for installation of drain piping
  • 6.3 SPM Location and Spatial Requirements
  • 6.4 Other materials
  • 6.5 Transportation, storage and custody of materials
  • 7 Pressure relief device location and position
  • 7.1 Inspection and maintenance
  • 7.2 Proximity to pressure source
  • 7.3 Proximity to other equipment
  • 7.4 Mounting position
  • 7.5 Test or lifting levers
  • 7.6 Heat tracing and insulation
  • 8 Bolting and gasketing
  • 8.1 Care in installation
  • 8.2 Proper gasketing and bolting for service requirements
  • 8.3 Welding
  • 8.4 Quality Control and Inspection
  • 9 Multiple pressure relief valves with staggered settings
  • 9.2 Installation of Mooring Foundation
  • 9.3 Laying of Mooring Lines
  • 9.4 Hook-up of Mooring Lines

1 Foreword

SY/T 6636-2005 was issued by National Energy Administration on 26 July 2005 and has been in force since 1 November 2005.

The SY/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.

The document runs to 9 pages in English translation.

2 Scope Preview

This standard applies to power of 150kW (200hp) and below the beam pumping unit with a multi-phase squirrel cage induction motors. This standard includes a user motor data sheet (see Appendix A) and an electric motor performance data required format (see Appendix B). Use of variable frequency power supply, and other motor speed is not within the scope of this standard, to be considered separately in order to obtain satisfactory performance.

SY/T 6636-2005 falls under ICS 75.180.10, in the field of petroleum and related technologies.

This catalogue holds 482 other SY/T standards in that field.

In this catalogue, SY/T standards carry edition years from 1973 to 2025.

3 About this standard

Sector: Oil & Gas Industry Standard (Recommended)

Issued by: National Energy Administration

English translation: about 9 pages (approximate)

Chinese original: about 14,122 characters

4 Related standards

Standards on related subjects:

SY/T 5324-2013 — Pre-Stress Insulated Tubing

SY 0007-1999 — Design standard of corrosion control for steel pipeline and storage tank

SY/T 6449-2024 — Calibration method of cementing quality tester

SY/T 6419-2024 — Use and maintenance of fiberglass tube

SY/T 6325-2024 — Specification for the management of electrical equipment for oil and gas pipelines

5 Classification and status

International classification (ICS): 75.180.10

Chinese Standard Classification (CCS): E 92

Prefix SY/T: recommended standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 9 pages — is available in the English PDF.

How to Download SY/T 6636-2005

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
9 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SY/T 6636-2005

$165.00