SL/T 631.6-2025Standard for construction quality acceptance of unit works of water conservancy and hydropower projects - Part 6: Installation works of hydro-generator units and auxiliary equipment systems (English PDF)
水利水电工程单元工程施工质量验收标准 第6部分: 水轮发电机组及辅助设备系统安装工程
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL/T 631.6-2025 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Recommended
Issue date
November 5, 2025
Implementation date
February 5, 2026
Scope
SL/T 631.6-2025 is the English-translated version of 水利水电工程单元工程施工质量验收标准 第6部分: 水轮发电机组及辅助设备系统安装工程.
SL/T 631.6-2025 is the Chinese industry standard "Standard for construction quality acceptance of unit works of water conservancy and hydropower projects - Part 6: Installation works of hydro-generator units and auxiliary equipment systems".
It was issued on November 5, 2025 by the Ministry of Water Resources of the People's Republic of China, and took effect on February 5, 2026. It is in force.
Found what you need?
Document preview — SL/T 631.6-2025
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources of the People's Republic of China.
Date of issue: 2025-11-05.
Date of implementation: 2026-02-05.
Status: valid.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download SL/T 631.6-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL/T 631.7-2025 — Standard for Acceptance of Construction Quality of Unit Projects in Water Conservancy and Hydropower Engineering - Part 7: Electrical Installation Engineering
SL/T 631.5-2025 — Construction Quality Acceptance Standards for Unit Projects of Water Conservancy and Hydropower Engineering - Part 5: Installation Engineering of Hydraulic Metal Structures
SL/T 631.8-2025 — Construction Quality Acceptance Standards for Unit Projects of Water Conservancy and Hydropower Engineering - Part 8: Safety Monitoring Engineering
SL/T 631.6-2025
$510.00