Valid

SL/T 617-2021Regulations for the preparation of project proposals for water conservancy and hydropower projects (English PDF)

水利水电工程项目建议书编制规程

Preview PDF

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for SL/T 617-2021 in 30 minutes.

Issued by

Ministry of Water Resources of the People's Republic of China

Level / Type

National · Recommended

Issue date

August 6, 2021

Implementation date

November 6, 2021

Scope

SL/T 617-2021 is the English-translated version of 水利水电工程项目建议书编制规程.

SL/T 617-2021 is the Chinese industry standard "Regulations for the preparation of project proposals for water conservancy and hydropower projects". It was issued on August 6, 2021 by the Ministry of Water Resources of the People's Republic of China, and took effect on November 6, 2021. It is in force and replaces SL 617-2013.

Found what you need?

Document preview — SL/T 617-2021

National Standard of the People's Republic of China

Issued by: Ministry of Water Resources of the People's Republic of China

Contents

  • Document data
1 Document data

Sector: Water Resources (industry standard).

Issuing body: Ministry of Water Resources of the People's Republic of China.

Date of issue: 2021-08-06.

Date of implementation: 2021-11-06.

Status: valid, replaces SL 617-2013.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Editions of SL/T 617

EditionTitleRevisionStatus
SL/T 617-2021Regulations for the preparation of project proposals for water conservancy and hydropower projects—Valid
SL 617-2013Specification for compiling project proposal of water resources and hydropower projects—Obsolete

This page sells the current edition, SL/T 617-2021. Earlier editions are listed for reference only.

How to Download SL/T 617-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SL/T 617-2021

$510.00