SL/T 311-2025Specifications for the selection of high-voltage electrical equipment and the design of power distribution devices in water conservancy and hydropower projects (English PDF)
水利水电工程高压电气设备选择及配电装置设计规范
This is a limited preview
Buy now to download the full PDF (118 pages)
Need quotation for your management?
Get a formal quotation for SL/T 311-2025 in 30 minutes.
Issued by
Ministry of Water Resources
Level / Type
National · Recommended
Issue date
December 22, 2025
Implementation date
March 22, 2026
Scope
SL/T 311-2025 is the English-translated version of 水利水电工程高压电气设备选择及配电装置设计规范.
SL/T 311-2025 — Specifications for the selection of high-voltage electrical equipment and the design of power distribution devices in water conservancy and hydropower projects
Found what you need?
Document preview — SL/T 311-2025
National Standard of the People's Republic of China
- Replacing
- SL 311-2004, SL 561-2012
Issued by: Ministry of Water Resources
Contents
- [Preview only]
- 1 Scope
- 2 Normative References
- 2.1 Terms
- 3 Terms and Definitions
- 4 Overview
- 4.1 General requirements
- 5 Technical Requirements
- 6 Calibration conditions
- 6.1 Environmental conditions
- 6.2 Measurement standards and other equipment
- 7 Calibration items and calibration methods
- 7.1 Calibration Items
- 7.2 Calibration method
- 8 Expression of calibration results
- 9 Recalibration interval
1 Foreword
SL/T 311-2025 was issued by Ministry of Water Resources on 22 December 2025 and has been in force since 22 March 2026.
It replaces the earlier edition SL 311-2004, SL 561-2012.
The SL/T prefix marks a recommended standard. It is not law in itself: it becomes binding when a contract names it, when a regulation or a mandatory standard refers to it, or when a producer declares conformity with it.
2 Scope Preview
SL/T 311-2025 carries no ICS number and no Chinese Standard Classification code.
This catalogue holds 229 other SL/T standards.
Of the 74 SL/T standards that do carry an ICS number, 24 (32%) fall under ICS 27, in the field of energy and heat transfer engineering.
3 About this standard
Issued by: Ministry of Water Resources
English translation: about 118 pages
Chinese original: about 178,121 characters
Supersedes the earlier edition SL 311-2004, SL 561-2012.
4 Related standards
Standards on related subjects:
SL/T 219-2026 — Specifications for water quality and aquatic ecosystem monitoring
SL/T 31.3-2025 — Specification for In-situ Testing of Soil and Rock Permeability in Water Conservancy and Hydropower Projects - Part 3: Borehole Pumping Test
SL/T 31.2-2025 — Specification for In-situ Testing of Soil and Rock Permeability in Water Conservancy and Hydropower Projects - Part 2: Water Injection Test
5 Classification and status
Chinese Standard Classification (CCS): P 62
Prefix SL/T: recommended standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 118 pages — is available in the English PDF.
How to Download SL/T 311-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL/T 317-2105 — Code for installation and acceptance of pumping station equipment
SL/T 219-2026 — Specifications for water quality and aquatic ecosystem monitoring
SL/T 105-2025 — Technical Specification for Corrosion Protection of Hydraulic Metal Structures
Secure payment via Stripe
Payments accepted
SL/T 311-2025
$2,735.00