SL 774-2019Specifications for excitation systems of small hydraulic generators (English PDF)
小型水轮发电机励磁系统技术条件
This is a limited preview
Buy now to download the full PDF (8 pages)
Need quotation for your management?
Get a formal quotation for SL 774-2019 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
January 1, 2019
Implementation date
May 1, 2019
Scope
SL 774-2019 is the English-translated version of 小型水轮发电机励磁系统技术条件.
SL 774-2019 is the Chinese standard "Specifications for excitation systems of small hydraulic generators". It was issued by Ministry of Water Resources of the People's Republic of China.
Found what you need?
Document preview — SL 774-2019
National Standard of the People's Republic of China
- ICS
- 29.160.40
- Classification
- K55
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- [Preview only]
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Soil Erosion Type Division
- 3.1 Grade 1 Type Area
- 3.2 Grade II Type Area
- 3.3 Scope and Feature
- 4 Soil Erosion Intensity Graduation
- 4.1 INTENSITY GRADUATION OF WATER EROSION AND GRAVITY EROSION
- 4.2 WIND EROSION AND MIXING EROSION (DEBRIS FLOW) INTENSITY GRADUATION
- 4.3 Layout of Multipurpose Tunnel
- 5 Soil Erosion Degree Graduation
- 5.1 Selection of Pressure State
- 5.2 Sectional Shape
- 5.3 Sectional Dimension
- 6 Hydraulic Design of Tunnel
- 6.1 Calculation Principle
- 6.2 Anti-cavitation Design of Hydraulic Tunnel with High Velocity
- 7 Design of Soil Tunnel
- 7.1 Support and Lining of Soil Tunnel
- 7.2 Joint Division of Soil Tunnel Lining and its Anti-Seepage and Waterstop
- 8 Design of Tunnel Section at Adverse Geology
- 9 Tunnel Support and Lining
- 9.1 General Requirements
- 9.2 Loads and Load Combinations
- 9.3 Concrete and Reinforced Concrete lining
- 9.4 Prestressed Concrete Lining
- 9.5 Unlined and Anchor-shotcrete Lined Tunnel
- 9.6 Design of Reinforced Concrete Lining Bifurcated Tunnel
- 9.7 Joints on Lining
- 9.8 Design of Water Retaining Jam
1 Foreword
SL 774-2019 was issued by Ministry of Water Resources of the People's Republic of China on 11 February 2019 and has been in force since 1 May 2019.
The SL prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.
The document runs to 8 pages in English translation.
2 Scope Preview
SL 774-2019 falls under ICS 29.160.40, in the field of electrical engineering.
This catalogue holds 2 other SL standards in that field.
In this catalogue, SL standards carry edition years from 1989 to 2020.
3 About this standard
Sector: Water Resources Industry Standard
Issued by: Ministry of Water Resources of the People's Republic of China
English translation: about 8 pages (approximate)
Chinese original: about 12,180 characters
4 Related standards
Standards on related subjects:
GB/T 14478-2025 — Basic technical specification of inlet valves for large and medium-sized hydraulic turbines
GB/T 10969-2008 — Specification for water passage components of hydraulic turbines, storage pumps and pump-turbines
JB/T 10384-2002 — Steel castings for flow passage components of small and medium-sized hydraulic turbines
SL 755-2017 — Technical code for small and medium-sized hydraulic turbine governing systems
SL 746-2016 — Code for start-up test of medium or small size for hydraulic-turbine and generator units
SL 696-2014 — Fundamental technical requirements of inlet valves for small hydraulic turbines
5 Classification and status
International classification (ICS): 29.160.40
Chinese Standard Classification (CCS): K 55
Prefix SL: mandatory standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.
How to Download SL 774-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
SL 774-2019
$195.00