Valid

SL 773-2018Guidelines for measurement and estimation of soil erosion in production and construction projects (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (107 pages)

Need quotation for your management?

Get a formal quotation for SL 773-2018 in 30 minutes.

Issued by

Ministry of Water Resources of the People's Republic of China

Level / Type

National · Mandatory

Issue date

October 23, 2018

Implementation date

January 23, 2019

Scope

SL 773-2018 (Guidelines for measurement and estimation of soil erosion in production and construction projects) is available as an English-translated PDF.

SL 773-2018 — This standard stipulates the classification of soil loss in production and construction projects, the calculation process of soil loss and the application regulations.

The calculation of soil loss by general disturbance surface, engineering excavation surface and engineering accumulation body of production and construction projects under hydraulic action, production under wind power The construction project generally disturbs the calculation of soil loss such as surface and engineering accumulations.

Found what you need?

Document preview — SL 773-2018

National Standard of the People's Republic of China

ICS
13.080.40
Classification
B 11

Issued by: Ministry of Water Resources of the People's Republic of China

Contents

  • What this standard covers1
  • Document data2
  • Standards quoted by this document3

What this standard covers

This standard stipulates the classification of soil loss in production and construction projects, the calculation process of soil loss and the application regulations. The calculation of soil loss by general disturbance surface, engineering excavation surface and engineering accumulation body of production and construction projects under hydraulic action, production under wind power The construction project generally disturbs the calculation of soil loss such as surface and engineering accumulations. This standard is applicable to the pre-forecast, in-process monitoring and post-calculation of soil loss in production and construction projects under the action of water and wind.

Document data

International classification (ICS): 13.080.40.

Chinese classification (CCS): B11.

Estimated length of the Chinese original: 162,123 words.

Standards quoted by this document

SL 419

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 107 pages — is available in the English PDF.

How to Download SL 773-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
107 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SL 773-2018

$2,030.00