SL 703-2015Assessment code for construction quality of irrigation and drainage engineering (English PDF)
This is a limited preview
Buy now to download the full PDF (63 pages)
Need quotation for your management?
Get a formal quotation for SL 703-2015 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
February 16, 2015
Implementation date
May 16, 2015
Scope
SL 703-2015 (Assessment code for construction quality of irrigation and drainage engineering) is available as an English-translated PDF.
SL 703-2015 — This Standard applies to the construction quality of irrigation and drainage works and meets the following requirements of small water projects evaluated.
1 water flow is not greater than 10m3/s of water hub. 2 small pumping station. 3 wells.
Found what you need?
Document preview — SL 703-2015
National Standard of the People's Republic of China
- ICS
- 93.16
- Classification
- P 57
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This Standard applies to the construction quality of irrigation and drainage works and meets the following requirements of small water projects evaluated. 1 water flow is not greater than 10m3/s of water hub. 2 small pumping station. 3 wells. 4 rainwater harvesting projects.
Document data
International classification (ICS): 93.16.
Chinese classification (CCS): P57.
Estimated length of the Chinese original: 94,969 words.
Standards quoted by this document
GB 8170; GB 50203; GB/T 50600; GB/T 50625; GB/T 50769; SL 176; SL 234; SL 631; SL 632; SL 633; SL 634; SL 635; SL 637; JJG 1027; JJF 1059
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 63 pages — is available in the English PDF.
How to Download SL 703-2015
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 703-2015
$2,029.00