SL 678-2014Technical guidelines for damming with cement granule (English PDF)
胶结颗粒料筑坝技术导则
SL 678 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SL/T 678-2025 | Technical Specifications for Cemented Dams | Valid |
| SL 678-2014 | Technical guidelines for damming with cement granule | Obsolete |
SL 678-2014 is obsolete. It has been replaced by SL/T 678-2025. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL 678-2014 in 30 minutes.
Issued by
Ministry of Water Resources
Level / Type
National · Mandatory
Issue date
March 28, 2014
Implementation date
June 28, 2014
Scope
SL 678-2014 is the English-translated version of 胶结颗粒料筑坝技术导则.
SL 678-2014 is the Chinese industry standard "Technical guidelines for damming with cement granule". It was issued on March 28, 2014 by the Ministry of Water Resources, and took effect on June 28, 2014. It is obsolete: it has been replaced by SL/T 678-2025.
Found what you need?
Document preview — SL 678-2014
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources.
Date of issue: 2014-03-28.
Date of implementation: 2014-06-28.
Status: obsolete, replaced by SL/T 678-2025.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download SL 678-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 678-2014
$435.00