SL 613-2013Code of practice for water resources protection planning (English PDF)

水资源保护规划编制规程

Preview PDF

SL 613 | Evolution and historical versions

Std IDTitleStatus
SL/T 613-2025Code of practice for water resources protection planningValid
SL 613-2013Code of practice for water resources protection planningObsolete

SL 613-2013 is obsolete. It has been replaced by SL/T 613-2025. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for SL 613-2013 in 30 minutes.

Issued by

Ministry of Water Resources

Level / Type

National · Mandatory

Issue date

August 8, 2013

Implementation date

November 8, 2013

Scope

SL 613-2013 is the English-translated version of 水资源保护规划编制规程.

SL 613-2013 is the Chinese industry standard "Code of practice for water resources protection planning". It was issued on August 8, 2013 by the Ministry of Water Resources, and took effect on November 8, 2013. It is obsolete: it has been replaced by SL/T 613-2025.

Found what you need?

Document preview — SL 613-2013

National Standard of the People's Republic of China

Issued by: Ministry of Water Resources

Contents

  • Document data
1 Document data

Sector: Water Resources (industry standard).

Issuing body: Ministry of Water Resources.

Date of issue: 2013-08-08.

Date of implementation: 2013-11-08.

Status: obsolete, replaced by SL/T 613-2025.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download SL 613-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SL 613-2013

$1,529.00