SL 565-2012Residual stress analysis for hydraulic steel structure by magnetoelastic method (English PDF)
水工金属结构残余应力测试方法 磁弹法
This is a limited preview
Buy now to download the full PDF (8 pages)
Need quotation for your management?
Get a formal quotation for SL 565-2012 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
January 1, 2012
Implementation date
January 1, 2012
Scope
SL 565-2012 is the English-translated version of 水工金属结构残余应力测试方法 磁弹法.
SL 565-2012 is the Chinese standard "Residual stress analysis for hydraulic steel structure by magnetoelastic method". This standard specifies the basic principles and methods of test magnetic bomb test method of residual stress. It was issued by Ministry of Water Resources of the People's Republic of China.
Found what you need?
Document preview — SL 565-2012
National Standard of the People's Republic of China
- ICS
- 91.080.10
- Classification
- P26
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- [Preview only]
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Soil Erosion Type Division
- 3.1 Grade 1 Type Area
- 3.2 Grade II Type Area
- 3.3 Scope and Feature
- 4 Soil Erosion Intensity Graduation
- 4.1 INTENSITY GRADUATION OF WATER EROSION AND GRAVITY EROSION
- 4.2 WIND EROSION AND MIXING EROSION (DEBRIS FLOW) INTENSITY GRADUATION
- 4.3 Layout of Multipurpose Tunnel
- 5 Soil Erosion Degree Graduation
- 5.1 Selection of Pressure State
- 5.2 Sectional Shape
- 5.3 Sectional Dimension
- 6 Hydraulic Design of Tunnel
- 6.1 Calculation Principle
- 6.2 Anti-cavitation Design of Hydraulic Tunnel with High Velocity
- 7 Design of Soil Tunnel
- 7.1 Support and Lining of Soil Tunnel
- 7.2 Joint Division of Soil Tunnel Lining and its Anti-Seepage and Waterstop
- 8 Design of Tunnel Section at Adverse Geology
- 9 Tunnel Support and Lining
- 9.1 General Requirements
- 9.2 Loads and Load Combinations
- 9.3 Concrete and Reinforced Concrete lining
- 9.4 Prestressed Concrete Lining
- 9.5 Unlined and Anchor-shotcrete Lined Tunnel
- 9.6 Design of Reinforced Concrete Lining Bifurcated Tunnel
- 9.7 Joints on Lining
- 9.8 Design of Water Retaining Jam
1 Foreword
SL 565-2012 is issued by Ministry of Water Resources of the People's Republic of China.
The SL prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.
The document runs to 8 pages in English translation.
2 Scope Preview
This standard specifies the basic principles and methods of test magnetic bomb test method of residual stress. It was issued by Ministry of Water Resources of the People's Republic of China.
SL 565-2012 falls under ICS 91.080.10, in the field of construction materials and building.
This catalogue holds 14 other SL standards in that field.
In this catalogue, SL standards carry edition years from 1989 to 2020.
3 About this standard
Sector: Water Resources Industry Standard
Issued by: Ministry of Water Resources of the People's Republic of China
English translation: about 8 pages (approximate)
Chinese original: about 8,818 characters
4 Related standards
Standards on related subjects:
GB 50205-2020 — Standard for acceptance of construction quality of steel structures
GB 50017-2017 — Standard for design of steel structures
GB 50661-2011 — Code for Welding of Steel Structures
SL/T 613-2025 — Regulations for the Preparation of Water Resources Protection Plans
SL/T 609-2025 — Design Guidelines for Fishways in Water Conservancy and Hydropower Projects
SL/T 582-2025 — Inspection and Testing Procedures for the Manufacturing and Installation Quality of Hydraulic Metal Structures
5 Classification and status
International classification (ICS): 91.080.10
Chinese Standard Classification (CCS): P 26
Prefix SL: mandatory standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 8 pages — is available in the English PDF.
How to Download SL 565-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
SL 565-2012
$105.00