SL 557-2012Rules of final accounts audit for completion of water capital construction project (English PDF)
水利基本建设项目竣工决算审计规程
This is a limited preview
Buy now to download the full PDF (35 pages)
Need quotation for your management?
Get a formal quotation for SL 557-2012 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
January 1, 2012
Implementation date
January 1, 2012
Scope
SL 557-2012 is the English-translated version of 水利基本建设项目竣工决算审计规程.
SL 557-2012 is the Chinese standard "Rules of final accounts audit for completion of water capital construction project". This standard applies to the competent department of the completion and acceptance of water conservancy construction projects completed audit of the accounts.
It was issued by Ministry of Water Resources of the People's Republic of China. It cites 2 other standards.
Found what you need?
Document preview — SL 557-2012
National Standard of the People's Republic of China
- ICS
- 93.160
- Classification
- P55
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- [Preview only]
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Soil Erosion Type Division
- 3.1 Grade 1 Type Area
- 3.2 Grade II Type Area
- 3.3 Scope and Feature
- 4 Soil Erosion Intensity Graduation
- 4.1 INTENSITY GRADUATION OF WATER EROSION AND GRAVITY EROSION
- 4.2 WIND EROSION AND MIXING EROSION (DEBRIS FLOW) INTENSITY GRADUATION
- 4.3 Layout of Multipurpose Tunnel
- 5 Soil Erosion Degree Graduation
- 5.1 Selection of Pressure State
- 5.2 Sectional Shape
- 5.3 Sectional Dimension
- 6 Hydraulic Design of Tunnel
- 6.1 Calculation Principle
- 6.2 Anti-cavitation Design of Hydraulic Tunnel with High Velocity
- 7 Design of Soil Tunnel
- 7.1 Support and Lining of Soil Tunnel
- 7.2 Joint Division of Soil Tunnel Lining and its Anti-Seepage and Waterstop
- 8 Design of Tunnel Section at Adverse Geology
- 9 Tunnel Support and Lining
- 9.1 General Requirements
- 9.2 Loads and Load Combinations
- 9.3 Concrete and Reinforced Concrete lining
- 9.4 Prestressed Concrete Lining
- 9.5 Unlined and Anchor-shotcrete Lined Tunnel
- 9.6 Design of Reinforced Concrete Lining Bifurcated Tunnel
- 9.7 Joints on Lining
- 9.8 Design of Water Retaining Jam
1 Foreword
SL 557-2012 is issued by Ministry of Water Resources of the People's Republic of China.
The SL prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.
The document runs to 35 pages in English translation.
2 Scope Preview
This standard applies to the competent department of the completion and acceptance of water conservancy construction projects completed audit of the accounts.
SL 557-2012 falls under ICS 93.160, in the field of civil engineering.
This catalogue holds 78 other SL standards in that field.
In this catalogue, SL standards carry edition years from 1989 to 2020.
3 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document.
SL 19
SL 223
4 About this standard
Issued by: Ministry of Water Resources of the People's Republic of China
English translation: about 35 pages (approximate)
5 Related standards
Standards on related subjects:
GB 50788-2012 — Technical code for water supply and sewerage of urban
SL 314-2004 — Design specification for roller compacted concrete dams
SL 282-2003 — Design specification for concrete arch dams
SL/T 551-2024 — Technical specification for safety monitoring of earth-rock dams
SL 564-2014 — Technical specification of earth dam grouting
SL 561-2012 — Design code for selecting conductor and electrical equipment of water resources and hydropower projects
6 Classification and status
International classification (ICS): 93.160
Chinese Standard Classification (CCS): P 55
Prefix SL: mandatory standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 35 pages — is available in the English PDF.
Referenced standards
How to Download SL 557-2012
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 19-2001 — Compilation rules of final account for completion of water capital construction project
SL 19-2008 — Compilation rules of final account for completion of water capital construction project
SL 223-1999 — Specification of construction acceptance on water resources and hydroelectric development
Secure payment via Stripe
Payments accepted
SL 557-2012
$620.00