SL 483-2010Flood risk mapping guidelines (English PDF)
洪水风险图编制导则
SL 483 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SL 483-2017 | [SL/T 483-2017] (Guidelines for the preparation of flood risk plans) | Valid |
| SL 483-2010 | Flood risk mapping guidelines | Obsolete |
SL 483-2010 is obsolete. It has been replaced by SL 483-2017. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL 483-2010 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
June 24, 2010
Implementation date
September 24, 2010
Scope
SL 483-2010 is the English-translated version of 洪水风险图编制导则.
SL 483-2010 is the Chinese industry standard "Flood risk mapping guidelines". It was issued on June 24, 2010 by the Ministry of Water Resources of the People's Republic of China, and took effect on September 24, 2010. It is obsolete: it has been replaced by SL 483-2017.
Found what you need?
Document preview — SL 483-2010
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources of the People's Republic of China.
Date of issue: 2010-06-24.
Date of implementation: 2010-09-24.
Status: obsolete, replaced by SL 483-2017.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download SL 483-2010
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 483-2010
$510.00