SL 45-1992Regulation for enviromental impact assesmentof river Basin planning (English PDF)
江河流域规划环境影响评价规范
SL 45 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SL 45-2006 | Regulation for environmental impact assessment of river basin planning | Valid |
| SL 45-1992 | Regulation for enviromental impact assesmentof river Basin planning | Obsolete |
SL 45-1992 is obsolete. It has been replaced by SL 45-2006. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL 45-1992 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
November 10, 1992
Implementation date
May 1, 1993
Scope
SL 45-1992 is the English-translated version of 江河流域规划环境影响评价规范.
SL 45-1992 is the Chinese industry standard "Regulation for enviromental impact assesmentof river Basin planning". It was issued on November 10, 1992 by the Ministry of Water Resources of the People's Republic of China, and took effect on May 1, 1993. It is obsolete: it has been replaced by SL 45-2006.
Found what you need?
Document preview — SL 45-1992
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources of the People's Republic of China.
Date of issue: 1992-11-10.
Date of implementation: 1993-05-01.
Status: obsolete, replaced by SL 45-2006.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download SL 45-1992
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 45-1992
$355.00