Valid

SL 448-2009Compilation rules on feasibility study report of soil and water conservation project (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (39 pages)

Need quotation for your management?

Get a formal quotation for SL 448-2009 in 30 minutes.

Issued by

Ministry of Water Resources of the People's Republic of China

Level / Type

National · Mandatory

Issue date

May 21, 2009

Implementation date

August 21, 2009

Scope

SL 448-2009 (Compilation rules on feasibility study report of soil and water conservation project) is available as an English-translated PDF.

SL 448-2009 — This standard applies to large, preparation of medium-sized Soil and Water Conservation Project feasibility study report, small Soil and Water Conservation project feasibility study report is available for implementation.

Found what you need?

Document preview — SL 448-2009

National Standard of the People's Republic of China

ICS
13.080
Classification
B 11

Issued by: Ministry of Water Resources of the People's Republic of China

Contents

  • What this standard covers1
  • Document data2

What this standard covers

This standard applies to large, preparation of medium-sized Soil and Water Conservation Project feasibility study report, small Soil and Water Conservation project feasibility study report is available for implementation. Special projects for water and soil conservation and utilization of foreign investment projects, the provisions of this standard can be made based on the characteristics of engineering tasks can also adjust the content and depth as needed.

Document data

International classification (ICS): 13.080.

Chinese classification (CCS): B11.

Estimated length of the Chinese original: 58,513 words.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 39 pages — is available in the English PDF.

How to Download SL 448-2009

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
39 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SL 448-2009

$590.00