SL 438-2008Specifications for design secondary circuit of hydroengineering (English PDF)

水利水电工程二次接线设计规范

Preview PDF

SL 438 | Evolution and historical versions

Std IDTitleStatus
SL/T 438-2025Specifications for design secondary circuit of hydroengineeringValid
SL 438-2008Specifications for design secondary circuit of hydroengineeringObsolete

SL 438-2008 is obsolete. It has been replaced by SL/T 438-2025. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for SL 438-2008 in 30 minutes.

Issued by

MWR

Level / Type

National · Mandatory

Issue date

December 16, 2008

Implementation date

March 16, 2009

Scope

SL 438-2008 is the English-translated version of 水利水电工程二次接线设计规范.

SL 438-2008 is the Chinese industry standard "Specifications for design secondary circuit of hydroengineering". It was issued on December 16, 2008 by MWR, and took effect on March 16, 2009. It is obsolete: it has been replaced by SL/T 438-2025.

Found what you need?

Document preview — SL 438-2008

National Standard of the People's Republic of China

Issued by: MWR

Contents

  • Document data
1 Document data

Sector: Water Resources (industry standard).

Issuing body: MWR.

Date of issue: 2008-12-16.

Date of implementation: 2009-03-16.

Status: obsolete, replaced by SL/T 438-2025.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download SL 438-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SL 438-2008

$710.00