SL 436-2008Specification of exploration for dike hidden trouble (English PDF)
堤防隐患探测规程
SL 436 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SL 436-2008 | Specification of exploration for dike hidden trouble | Obsolete |
SL 436-2008 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL 436-2008 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
October 6, 2008
Implementation date
January 6, 2009
Scope
SL 436-2008 is the English-translated version of 堤防隐患探测规程.
SL 436-2008 is the Chinese industry standard "Specification of exploration for dike hidden trouble". It was issued on October 6, 2008 by the Ministry of Water Resources of the People's Republic of China, and took effect on January 6, 2009. It is obsolete: it has been withdrawn.
Found what you need?
Document preview — SL 436-2008
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources of the People's Republic of China.
Date of issue: 2008-10-06.
Date of implementation: 2009-01-06.
Status: obsolete, withdrawn.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download SL 436-2008
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
SL 436-2008
$435.00