SL 383-2007Specification for river channel change survey (English PDF)
This is a limited preview
Buy now to download the full PDF (26 pages)
Need quotation for your management?
Get a formal quotation for SL 383-2007 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
July 14, 2007
Implementation date
October 14, 2007
Scope
SL 383-2007 (Specification for river channel change survey) is available as an English-translated PDF.
SL 383-2007 — This standard applies to the evolution of the river channel evolution investigation and analysis of the survey work, lakes, reservoir, Line (storage) flood zone survey may refer to the evolution of the investigation.
Found what you need?
Document preview — SL 383-2007
National Standard of the People's Republic of China
- ICS
- 17.120
- Classification
- P 12
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard applies to the evolution of the river channel evolution investigation and analysis of the survey work, lakes, reservoir, Line (storage) flood zone survey may refer to the evolution of the investigation.
Document data
International classification (ICS): 17.120.
Chinese classification (CCS): P12.
Estimated length of the Chinese original: 39,362 words.
Standards quoted by this document
GB 50159-1992; GB 50179-1993; GBJ 138-1990; GB/T 18314-2001; SL 42-1992; SL 43-1992; SL 58-1993; SL 59-1993; SL 195-1997; SL 196-1997; SL 197-1997; SL 219-1998; SL 247-1999; SL 257-2000; SL 291-2003; SL 337-2006
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 26 pages — is available in the English PDF.
How to Download SL 383-2007
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 383-2007
$405.00