SL 302-2004Technical specification for sluicing-siltation earth dam (English PDF)
水坠坝技术规范
SL 302 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SL 302-2004 | Technical specification for sluicing-siltation earth dam | Obsolete |
SL 302-2004 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL 302-2004 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
August 2, 2004
Implementation date
November 1, 2004
Scope
SL 302-2004 is the English-translated version of 水坠坝技术规范.
SL 302-2004 is the Chinese industry standard "Technical specification for sluicing-siltation earth dam". It was issued on August 2, 2004 by the Ministry of Water Resources of the People's Republic of China, and took effect on November 1, 2004. It is obsolete: it has been withdrawn.
Found what you need?
Document preview — SL 302-2004
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources of the People's Republic of China.
Date of issue: 2004-08-02.
Date of implementation: 2004-11-01.
Status: obsolete, withdrawn.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download SL 302-2004
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
SL 302-2004
$435.00