Valid

SL 297-2004Acceptance standards of flood prevention reserves (English PDF)

防汛储备物资验收标准

Preview PDF

This is a limited preview

Buy now to download the full PDF (17 pages)

Need quotation for your management?

Get a formal quotation for SL 297-2004 in 30 minutes.

Issued by

Ministry of Water Resources of the People's Republic of China

Level / Type

National · Mandatory

Issue date

April 16, 2004

Implementation date

May 20, 2004

Scope

SL 297-2004 is the English-translated version of 防汛储备物资验收标准.

SL 297-2004 is the Chinese standard "Acceptance standards of flood prevention reserves". This standard applies to: flood control departments at all levels of special reserves flood control materials acceptance. Issued on 2004-04-16, in force from 2004-05-20.

Found what you need?

Document preview — SL 297-2004

National Standard of the People's Republic of China

ICS
93.160
Classification
P58

Contents

  • [Preview only]
  • 1 General Provisions
  • 2 Terms and Symbols
  • 2.1 Terms
  • 2.2 Symbols
  • 3 Soil Erosion Type Division
  • 3.1 Grade 1 Type Area
  • 3.2 Grade II Type Area
  • 3.3 Scope and Feature
  • 4 Soil Erosion Intensity Graduation
  • 4.1 INTENSITY GRADUATION OF WATER EROSION AND GRAVITY EROSION
  • 4.2 WIND EROSION AND MIXING EROSION (DEBRIS FLOW) INTENSITY GRADUATION
  • 4.3 Layout of Multipurpose Tunnel
  • 5 Soil Erosion Degree Graduation
  • 5.1 Selection of Pressure State
  • 5.2 Sectional Shape
  • 5.3 Sectional Dimension
  • 6 Hydraulic Design of Tunnel
  • 6.1 Calculation Principle
  • 6.2 Anti-cavitation Design of Hydraulic Tunnel with High Velocity
  • 7 Design of Soil Tunnel
  • 7.1 Support and Lining of Soil Tunnel
  • 7.2 Joint Division of Soil Tunnel Lining and its Anti-Seepage and Waterstop
  • 8 Design of Tunnel Section at Adverse Geology
  • 9 Tunnel Support and Lining
  • 9.1 General Requirements
  • 9.2 Loads and Load Combinations
  • 9.3 Concrete and Reinforced Concrete lining
  • 9.4 Prestressed Concrete Lining
  • 9.5 Unlined and Anchor-shotcrete Lined Tunnel
  • 9.6 Design of Reinforced Concrete Lining Bifurcated Tunnel
  • 9.7 Joints on Lining
  • 9.8 Design of Water Retaining Jam

1 Foreword

SL 297-2004 was issued by Ministry of Water Resources of the People's Republic of China on 16 April 2004 and has been in force since 20 May 2004.

The SL prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.

The document runs to 17 pages in English translation.

2 Scope Preview

This standard applies to: flood control departments at all levels of special reserves flood control materials acceptance.

SL 297-2004 falls under ICS 93.160, in the field of civil engineering.

This catalogue holds 78 other SL standards in that field.

In this catalogue, SL standards carry edition years from 1989 to 2020.

3 About this standard

Sector: Water Resources Industry Standard

Issued by: Ministry of Water Resources of the People's Republic of China

English translation: about 17 pages (approximate)

Chinese original: about 25,280 characters

4 Related standards

Standards on related subjects:

NB 35047-2015 — Code for seismic design of hydraulic structures of hydropower projects

SL 314-2004 — Design specification for roller compacted concrete dams

SL 282-2003 — Design specification for concrete arch dams

SL/T 818-2023 — Guidelines for preparation of joint dispatching plan of river basin flood control projects

SL/T 165-2019 — Technical regulations for landslide surge simulation

SL/T 164-2019 — Regulation for simulation of dam-break flow

5 Classification and status

International classification (ICS): 93.160

Chinese Standard Classification (CCS): P 58

Prefix SL: mandatory standard.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.

How to Download SL 297-2004

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
17 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SL 297-2004

$500.00