SL 297-2004Acceptance standards of flood prevention reserves (English PDF)
防汛储备物资验收标准
This is a limited preview
Buy now to download the full PDF (17 pages)
Need quotation for your management?
Get a formal quotation for SL 297-2004 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
April 16, 2004
Implementation date
May 20, 2004
Scope
SL 297-2004 is the English-translated version of 防汛储备物资验收标准.
SL 297-2004 is the Chinese standard "Acceptance standards of flood prevention reserves". This standard applies to: flood control departments at all levels of special reserves flood control materials acceptance. Issued on 2004-04-16, in force from 2004-05-20.
Found what you need?
Document preview — SL 297-2004
National Standard of the People's Republic of China
- ICS
- 93.160
- Classification
- P58
Contents
- [Preview only]
- 1 General Provisions
- 2 Terms and Symbols
- 2.1 Terms
- 2.2 Symbols
- 3 Soil Erosion Type Division
- 3.1 Grade 1 Type Area
- 3.2 Grade II Type Area
- 3.3 Scope and Feature
- 4 Soil Erosion Intensity Graduation
- 4.1 INTENSITY GRADUATION OF WATER EROSION AND GRAVITY EROSION
- 4.2 WIND EROSION AND MIXING EROSION (DEBRIS FLOW) INTENSITY GRADUATION
- 4.3 Layout of Multipurpose Tunnel
- 5 Soil Erosion Degree Graduation
- 5.1 Selection of Pressure State
- 5.2 Sectional Shape
- 5.3 Sectional Dimension
- 6 Hydraulic Design of Tunnel
- 6.1 Calculation Principle
- 6.2 Anti-cavitation Design of Hydraulic Tunnel with High Velocity
- 7 Design of Soil Tunnel
- 7.1 Support and Lining of Soil Tunnel
- 7.2 Joint Division of Soil Tunnel Lining and its Anti-Seepage and Waterstop
- 8 Design of Tunnel Section at Adverse Geology
- 9 Tunnel Support and Lining
- 9.1 General Requirements
- 9.2 Loads and Load Combinations
- 9.3 Concrete and Reinforced Concrete lining
- 9.4 Prestressed Concrete Lining
- 9.5 Unlined and Anchor-shotcrete Lined Tunnel
- 9.6 Design of Reinforced Concrete Lining Bifurcated Tunnel
- 9.7 Joints on Lining
- 9.8 Design of Water Retaining Jam
1 Foreword
SL 297-2004 was issued by Ministry of Water Resources of the People's Republic of China on 16 April 2004 and has been in force since 20 May 2004.
The SL prefix, without a suffix, marks a mandatory standard: within its scope, compliance is required.
The document runs to 17 pages in English translation.
2 Scope Preview
This standard applies to: flood control departments at all levels of special reserves flood control materials acceptance.
SL 297-2004 falls under ICS 93.160, in the field of civil engineering.
This catalogue holds 78 other SL standards in that field.
In this catalogue, SL standards carry edition years from 1989 to 2020.
3 About this standard
Sector: Water Resources Industry Standard
Issued by: Ministry of Water Resources of the People's Republic of China
English translation: about 17 pages (approximate)
Chinese original: about 25,280 characters
4 Related standards
Standards on related subjects:
NB 35047-2015 — Code for seismic design of hydraulic structures of hydropower projects
SL 314-2004 — Design specification for roller compacted concrete dams
SL 282-2003 — Design specification for concrete arch dams
SL/T 818-2023 — Guidelines for preparation of joint dispatching plan of river basin flood control projects
SL/T 165-2019 — Technical regulations for landslide surge simulation
SL/T 164-2019 — Regulation for simulation of dam-break flow
5 Classification and status
International classification (ICS): 93.160
Chinese Standard Classification (CCS): P 58
Prefix SL: mandatory standard.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.
How to Download SL 297-2004
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
SL 297-2004
$500.00