SL 290-2009Specifications on land requisition and resettlement design for construction of water resources and hydropower project (English PDF)
水利水电工程建设征地移民安置规划设计规范
SL 290 | Evolution and historical versions
| Std ID | Title | Status |
|---|---|---|
| SL 290-2009 | Specifications on land requisition and resettlement design for construction of water resources and hydropower project | Obsolete |
SL 290-2009 is obsolete. This page sells the obsolete edition, for projects and contracts that still cite it.
This is a limited preview
Buy now to download the full PDF
Need quotation for your management?
Get a formal quotation for SL 290-2009 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
July 31, 2009
Implementation date
October 31, 2009
Scope
SL 290-2009 is the English-translated version of 水利水电工程建设征地移民安置规划设计规范.
SL 290-2009 is the Chinese industry standard "Specifications on land requisition and resettlement design for construction of water resources and hydropower project".
It was issued on July 31, 2009 by the Ministry of Water Resources of the People's Republic of China, and took effect on October 31, 2009. It is obsolete: it has been withdrawn.
Found what you need?
Document preview — SL 290-2009
National Standard of the People's Republic of China
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- Document data
1 Document data
Sector: Water Resources (industry standard).
Issuing body: Ministry of Water Resources of the People's Republic of China.
Date of issue: 2009-07-31.
Date of implementation: 2009-10-31.
Status: obsolete, withdrawn.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
How to Download SL 290-2009
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
SL 290-2009
$435.00