SL 253-2018Design specification for spillway (English PDF)
This is a limited preview
Buy now to download the full PDF (127 pages)
Need quotation for your management?
Get a formal quotation for SL 253-2018 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
July 17, 2018
Implementation date
October 17, 2018
Scope
SL 253-2018 (Design specification for spillway) is available as an English-translated PDF.
SL 253-2018 — This standard is applicable to the design of Grade 1, 2, and 3 spillways (including ski spillways and spillway tunnels) on rock foundations in large and medium-sized water conservancy and hydropower projects.
Found what you need?
Document preview — SL 253-2018
National Standard of the People's Republic of China
- ICS
- 93.160
- Classification
- P 59
- Replacing
- SL 253-2000
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard is applicable to the design of Grade 1, 2, and 3 spillways (including ski spillways and spillway tunnels) on rock foundations in large and medium-sized water conservancy and hydropower projects. The 4th and 5th spillway designs can be used as reference.
Document data
International classification (ICS): 93.160.
Chinese classification (CCS): P59.
Estimated length of the Chinese original: 193,138 words.
Supersedes the earlier edition SL 253-2000.
Standards quoted by this document
GB/T 50662; GB 51247; SL 47; SL 191; SL 252; SL 265; SL 279; SL 319; SL 379; SL 386; SL 486; SL 616; SL 654; SL 725; SL 744; DL/T 5207
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 127 pages — is available in the English PDF.
How to Download SL 253-2018
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 253-2018
$1,100.00