SL 206-2014Regulation for economic benefit analysis calculation and evaluation of existing flood control projects (English PDF)
This is a limited preview
Buy now to download the full PDF (40 pages)
Need quotation for your management?
Get a formal quotation for SL 206-2014 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
May 9, 2014
Implementation date
August 9, 2014
Scope
SL 206-2014 (Regulation for economic benefit analysis calculation and evaluation of existing flood control projects) is available as an English-translated PDF.
SL 206-2014 — This standard applies to become a flood in flood control project or period analysis and evaluation of the actual calculation of the benefits produced.
Found what you need?
Document preview — SL 206-2014
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- P 58
- Replacing
- SL 206-1998
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard applies to become a flood in flood control project or period analysis and evaluation of the actual calculation of the benefits produced.
Document data
International classification (ICS): 27.140.
Chinese classification (CCS): P58.
Estimated length of the Chinese original: 60,627 words.
Supersedes the earlier edition SL 206-1998.
Standards quoted by this document
SL 72; SL 104
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 40 pages — is available in the English PDF.
How to Download SL 206-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 206-2014
$1,274.00