SL 17-2014Technical specifications for dredging and filling projects (English PDF)
This is a limited preview
Buy now to download the full PDF (72 pages)
Need quotation for your management?
Get a formal quotation for SL 17-2014 in 30 minutes.
Issued by
Ministry of Water Resources of the People's Republic of China
Level / Type
National · Mandatory
Issue date
May 9, 2014
Implementation date
August 9, 2014
Scope
SL 17-2014 (Technical specifications for dredging and filling projects) is available as an English-translated PDF.
SL 17-2014 — Technical specifications for dredging and filling projects
Found what you need?
Document preview — SL 17-2014
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- P 55
- Replacing
- SL 17-1990
Issued by: Ministry of Water Resources of the People's Republic of China
Contents
- What this standard covers1
- Document data2
- Standards quoted by this document3
What this standard covers
This standard applies to rivers, lakes, reservoirs, beaches, canals and other Dredging and Reclamation of mechanical engineering design, construction and quality acceptance.
Document data
International classification (ICS): 27.140.
Chinese classification (CCS): P55.
Estimated length of the Chinese original: 109,185 words.
Supersedes the earlier edition SL 17-1990.
Standards quoted by this document
GB 4284; GB 8978; GB 15618; GB 16889; GB/T 18314; GB 50021; GB/T 50145; GB 50286; GB 50487; SL 52; SL 176; SL 197; SL 223; SL/T 225; SL 237; SL 278; SL 303; SL 389; SL 398; SL 399; SL 401; SL 631; CJJ 112; HJ 564
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 72 pages — is available in the English PDF.
How to Download SL 17-2014
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
SL 274-2020 — Design code for rolled earth-rock fill dams
SL 285-2020 — Design specification for intakes of water and hydropower projects
SL 47-2020 — Technical specification for excavation construction of rock-foundation of hydraulic structures
Secure payment via Stripe
Payments accepted
SL 17-2014
$1,900.00