SH/T 3039-2003General seismic design rule of non-buried pipe for petrochemical industry (English PDF)

石油化工非埋地管道设计通则

Preview PDF

SH/T 3039 | Evolution and historical versions

Std IDTitleStatus
SH/T 3039-2018General seismic design rule of non-buried pipe for petrochemical industryValid
SH/T 3039-2003General seismic design rule of non-buried pipe for petrochemical industryObsolete

SH/T 3039-2003 is obsolete. It has been replaced by SH/T 3039-2018. This page sells the obsolete edition, for projects and contracts that still cite it.

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for SH/T 3039-2003 in 30 minutes.

Issued by

SinoPec Engineering Construction Management Department

Level / Type

National · Recommended

Issue date

March 10, 2004

Implementation date

July 1, 2004

Scope

SH/T 3039-2003 is the English-translated version of 石油化工非埋地管道设计通则.

SH/T 3039-2003 is the Chinese industry standard "General seismic design rule of non-buried pipe for petrochemical industry". It was issued on March 10, 2004 by SinoPec Engineering Construction Management Department, and took effect on July 1, 2004. It is obsolete: it has been replaced by SH/T 3039-2018.

Found what you need?

Document preview — SH/T 3039-2003

National Standard of the People's Republic of China

Issued by: SinoPec Engineering Construction Management Department

Contents

  • Document data
1 Document data

Sector: Petrochemical (industry standard).

Issuing body: SinoPec Engineering Construction Management Department.

Date of issue: 2004-03-10.

Date of implementation: 2004-07-01.

Status: obsolete, replaced by SH/T 3039-2018.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

How to Download SH/T 3039-2003

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

SH/T 3039-2003

$145.00