SY/T — Petroleum & Gas

Found: 4575 — page 79 of 96

PDF

SY/T 5680-1995 — KN · m rope tester technical conditions

National·Recommended
Superseded$70.00
PDF

SY/T 5683-1995 — Logging neutron generator technical conditions

National·Recommended
Withdrawn$225.00
PDF

SY/T 5687-1995 — General rules for reliability of drilling and production equipment

National·Recommended
Valid$514.00
PDF

SY/T 5688-1995 — Hydraulic external cutters

National·Recommended
Withdrawn$225.00
PDF

SY/T 5689-1995 — Single screw pump ground drive

National·Recommended
Superseded$205.00
PDF

SY/T 5690-1995 — Regulations for the management and provision of personal protective equipment for employees of petroleum enterprises

National·Recommended
Withdrawn$225.00
PDF

SY/T 5691-1995 — Wireline formation tester standardized test data interpretation

National·Recommended
Superseded$205.00
PDF

SY/T 5692-1995 — Wireline formation tester to test operating procedures

National·Recommended
Superseded$85.00
PDF

SY/T 5693-1995 — LOGGING instrument maintenance and calibration Technical Specification

National·Recommended
Superseded$205.00
PDF

SY/T 5695-1995 — Viscosity reducer XY27 of zwitterionic copolymer for drilling fluid

National·Recommended
Superseded$85.00
PDF

SY/T 5696-1995 — Dynamic coating agent FA367 of zwitterionic copolymer for drilling fluid

National·Recommended
Superseded$85.00
PDF

SY/T 5697-1995 — Production Engineering Information Code

National·Recommended
Superseded$1,470.00
PDF

SY/T 5699-1995 — Enhance short section

National·Recommended
Superseded$70.00
PDF

SY/T 5700-1995 — Conventional beam pumping wells rules

National·Recommended
Superseded$70.00
PDF

SY/T 5701-1995 — Liner cementing operation rules

National·Recommended
Withdrawn$225.00
PDF

SY/T 5702-1995 — Iron-chromium lignosulfonate for drilling fluid

National·Recommended
Withdrawn$225.00
PDF

SY/T 5703-1995 — Oil well logging information code

National·Recommended
Superseded$205.00
PDF

SY/T 5704.1-1995 — Diplog instrument maintenance procedures and scale. 1016 Dipmeter

National·Recommended
Withdrawn$225.00
PDF

SY/T 5704.2-1995 — Diplog instrument maintenance procedures and scale. HDT Dipmeter

National·Recommended
Withdrawn$225.00
PDF

SY/T 5705-1995 — Database file formats for petroleum drilling engineering

National·Recommended
Superseded$1,700.00
PDF

SY/T 5706-1995 — Oil and gas reserves outcome data file format

National·Recommended
Superseded$750.00
PDF

SY/T 5707-1995 — Drilling pump infusion pump

National·Recommended
Withdrawn$225.00
PDF

SY/T 5708-1995 — Oil and Gas Field Surface Engineering Construction and Management Information Code

National·Recommended
Superseded$1,800.00
PDF

SY/T 5709-1995 — Heavy oil oil test specification and test data admission

National·Recommended
Withdrawn$225.00
PDF

SY/T 5710-1995 — Wellhead test performance test

National·Recommended
Superseded$55.00
PDF

SY/T 5711-1995 — Methods for copper plating and phosphating of screwed brush for drilling tools

National·Recommended
Superseded$55.00
PDF

SY/T 5712-1995 — Performance inspection of pressure-controlled testers

National·Recommended
Withdrawn$225.00
PDF

SY/T 5713-1995 — Gas Engineering Information Code

National·Recommended
Superseded$510.00
PDF

SY/T 5715-1995 — General techncial conditions for pressure-bearing steel casting used for petroleum drilling mechanical products

National·Recommended
Superseded$135.00
PDF

SY/T 5716.9-1995 — Oil rig overhaul technical conditions torque converter

National·Recommended
Withdrawn$225.00
PDF

SY/T 5718-1995 — Write regulations exploratory oil test mining results report

National·Recommended
Superseded$300.00
PDF

SY/T 5722-1995 — General Technical Specifications for Continuous Inclinometer

National·Recommended
Valid$304.00
PDF

SY/T 5723-1995 — Mountain Earthquake Drill

National·Recommended
Superseded$90.00
PDF

SY/T 5724-1995 — Casing string design

National·Recommended
Superseded$355.00
PDF

SY/T 5725-1995 — Calcium Carbonate Superfine Powder for Drilling Fluid

National·Recommended
Superseded$240.00
PDF

SY/T 5729-1995 — Heavy oil thermal recovery wells back to the wells operating procedures

National·Recommended
Superseded$55.00
PDF

SY/T 5730-1995 — Conventional cementing procedures

National·Recommended
Withdrawn$225.00
PDF

SY/T 5731-1995 — Camp column wellhead jacket hanging load calculation method

National·Recommended
Superseded$630.00
PDF

SY/T 5732-1995 — Locking finger-type pump off connector

National·Recommended
Superseded$105.00
PDF

SY/T 5733-1995 — Injection wells eccentric water column stratification test deployment procedures

National·Recommended
Superseded$85.00
PDF

SY/T 5734-1995 — Test Specification for Examining Seal of Under-well Packer for Separate Mining and Separate Injection Well

National·Recommended
Superseded$90.00
PDF

SY/T 5735-1995 — Geochemistry Evaluation Method for Land Facies Hydrocarbon Source Rock

National·Recommended
Superseded$315.00
PDF

SY/T 5738-1995 — Oil equipment repair work quota

National·Recommended
Superseded$1,110.00
PDF

SY/T 5739-1995 — Substation equipment maintenance work quota

National·Recommended
Superseded$1,510.00
PDF

SY/T 5740-1995 — Polymer flooding pilot test design requirements

National·Recommended
Superseded$285.00
PDF

SY/T 5744-1995 — Specification for annular pressure testing of rod-pumped well

National·Recommended
Superseded$85.00
PDF

SY/T 5745-1995 — Major terms of oil and gas production engineering

National·Recommended
Superseded$815.00
PDF

SY/T 5746-1995 — Submersible pump wells dynamic control chart preparation and method of use

National·Recommended
Superseded$245.00