SY/T — Petroleum & Gas

Found: 4575 — page 49 of 96

7 pages

SY/T 6813-2010 — The calibration method of the down hole temperature logging tool

National·Recommended
Valid$209.00
PDF

SY/T 6814-2010 — Calibration method of the double-channel echo instrument

National·Recommended
Superseded$189.00
11 pages

SY/T 6815-2010 — Calibration method of the measurment separator for oilwell

National·Recommended
Valid$309.00
PDF

SY/T 6816-2010 — Calibration method of equipment for measuring sand content in drilling fluids

National·Recommended
Superseded$209.00
8 pages

SY/T 6817-2010 — Calibration method of the shock-resistant pressure gauge

National·Recommended
Valid$229.00
5 pages

SY/T 7516-2010 — Determination of pour point of modified crude oil. Melting method

National·Recommended
Valid$149.00
9 pages

SY/T 7517-2010 — Determination for heal capacity of crude oil

National·Recommended
Valid$269.00
PDF

SY 4210-2009 — Code for quality acceptance of oil and gas construction engineering. Road engineering

National·Mandatory
Withdrawn$165.00
PDF

SY 4211-2009 — Code for quality acceptance of oil and gas construction engineering. Bridge Engineering

National·Mandatory
Withdrawn$165.00
PDF

SY/T 0033-2009 — Code for design of oil-gas field electrical power substation and distribution

National·Recommended
Superseded$235.00
PDF

SY/T 0048-2009 — Design specifications of general plan petroleum and natural gas engineering

National·Recommended
Superseded$620.00
4 pages

SY/T 0541-2009 — Test method for gel point of crude oils

National·Recommended
Valid$85.00
5 pages

SY/T 0543-2009 — Sampling method of natureal gasoline

National·Recommended
Valid$145.00
PDF

SY/T 0600-2009 — Prediction of scaling tendency in oil-field water

National·Recommended
Superseded$115.00
PDF

SY/T 0601-2009 — Determination of emulsified oil and soluble oil in water

National·Recommended
Superseded$115.00
130 pages

SY/T 10025-2009 — Pre-operation inspection for offshore drilling unit

National·Recommended
Valid$325.00
PDF

SY/T 5049-2009 — Drilling slip

National·Recommended
Superseded$120.00
PDF

SY/T 5051-2009 — Drilling tool stabilizers

National·Recommended
Superseded$210.00
PDF

SY/T 5059-2009 — Tubing pump with combined liners

National·Recommended
Superseded$345.00
PDF

SY/T 5069-2009 — Spear for drilling and servicing

National·Recommended
Superseded$105.00
PDF

SY/T 5211-2009 — Fracturing unit

National·Recommended
Superseded$470.00
PDF

SY/T 5254-2009 — Logging data processing symbol

National·Recommended
Superseded$500.00
PDF

SY/T 5262-2009 — Specification for fire tube type heater

National·Recommended
Superseded$265.00
PDF

SY/T 5267-2009 — Determination of loss of crud oil in the oil field

National·Recommended
Superseded$165.00
PDF

SY/T 5299-2009 — Code for well line bridge plug and cementing operation

National·Recommended
Superseded$105.00
4 pages

SY/T 5350-2009 — Evaluation procedure for foaming agents used in drilling fluids

National·Recommended
Valid$55.00
PDF

SY/T 5373-2009 — Diagram and symbol for down hole drilling tools and operation

National·Recommended
Superseded$405.00
PDF

SY/T 5434-2009 — Analysis method for particle size of clastic rocks

National·Recommended
Superseded$195.00
PDF

SY/T 5440-2009 — Technical specifications for natural gas well testing

National·Recommended
Superseded$710.00
15 pages

SY/T 5464-2009 — Computational method for logging and perforating quality index

National·Recommended
Valid$105.00
15 pages

SY/T 5481-2009 — Technical specification of seismic date interpretation

National·Recommended
Valid$345.00
PDF

SY/T 5503-2009 — Test method of chloride content in rock

National·Recommended
Superseded$105.00
PDF

SY/T 5504.6-2009 — Evaluation method for well cement additives. Part 6: Light-weight additive

National·Recommended
Superseded$195.00
PDF

SY/T 5525-2009 — The upper and lower kelly cock of the rotary equipment on drilling industry

National·Recommended
Superseded$165.00
PDF

SY/T 5552-2009 — Ground anchor vehicle

National·Recommended
Superseded$195.00
PDF

SY/T 5557-2009 — Technical specification for cementing package

National·Recommended
Superseded$455.00
PDF

SY/T 5585-2009 — Test methods for seismic data transmission cable electrical parameters

National·Recommended
Superseded$225.00
PDF

SY/T 5595-2009 — Oil drilling rig drive roller chains

National·Recommended
Superseded$690.00
7 pages

SY/T 5601-2009 — Geological estimation method for natural gas reservoir

National·Recommended
Valid$135.00
PDF

SY/T 5618-2009 — Float collar and float shoe for casing

National·Recommended
Superseded$165.00
PDF

SY/T 5619-2009 — Methods of bottom hole assembly for planning in directional wells

National·Recommended
Superseded$165.00
16 pages

SY/T 5623-2009 — Prediction and detection methods of formation pressure

National·Recommended
Valid$285.00
PDF

SY/T 5633-2009 — Format for petroleum logging charts

National·Recommended
Superseded$500.00
PDF

SY/T 5641-2009 — Petroleum and natural gas industry. Natural gas engine

National·Recommended
Superseded$195.00
PDF

SY/T 5733-2009 — Procedures of stratified flow rate testing and adjusting on injection wells with eccentric water tube

National·Recommended
Superseded$165.00
PDF

SY/T 5928-2009 — Specifications for seismic exploration data delivering filing and keeping

National·Recommended
Superseded$105.00
PDF

SY/T 5939-2009 — Operation and maintenance for gravimeter

National·Recommended
Withdrawn$240.00
15 pages

SY/T 5972-2009 — Type selection for rig foundation

National·Recommended
Valid$195.00