SY/T — Petroleum & Gas
Found: 4575 — page 40 of 96
PDF
SY/T 5340-2012 — Practice for gravel pack of sand control
National·Recommended
Superseded$525.00
PDF
SY/T 5348-2012 — Drilling fluid resistivity meters
National·Recommended
Valid$224.00
PDF
SY/T 5369-2012 — Management and application of drilling tools. Kelly, drill pipe and drill collar
National·Recommended
Valid$454.00
PDF
SY/T 5396-2012 — Well-site transportation, storing and inspection criterion for oil casin
National·Recommended
Valid$454.00
PDF
SY/T 5415-2012 — Use and dull grading system of bits
National·Recommended
Valid$324.00
PDF
SY/T 5435-2012 — Wellpath planning and trajectory calculation for directional wells
National·Recommended
Valid$1,379.00
PDF
SY/T 5491-2012 — Labor quota for seismic crew
National·Recommended
Superseded$105.00
PDF
SY/T 5495-2012 — Labor quota for long-distance pipeline construction
National·Recommended
Valid$1,429.00
PDF
SY/T 5498-2012 — Labor quota for seismic prospecting with truck-mounted rig
National·Recommended
Superseded$465.00
PDF
SY/T 5499-2012 — Labor quota for seismic prospecting with protable rig
National·Recommended
Superseded$405.00
PDF
SY/T 5507-2012 — Labor quota for seismic prospecting with vibrator
National·Recommended
Superseded$225.00
PDF
SY/T 5524-2012 — Petroleum seismic exploration rig
National·Recommended
Superseded$195.00
PDF
SY/T 5547-2012 — Operation maintenance and management for positive displacement mud motor
National·Recommended
Valid$304.00
PDF
SY/T 5550-2012 — Hollow sucker rods
National·Recommended
Valid$1,569.00
PDF
SY/T 5553-2012 — Labor quota for drilling engineering
National·Recommended
Superseded$970.00
PDF
SY/T 5572-2012 — Fishing tool classification and technical regulations for drilling and servicing
National·Recommended
Valid$244.00
PDF
SY/T 5587.10-2012 — Code for conventional workover job. Part 10: Hydroblasting perforation
National·Recommended
Superseded$55.00
PDF
SY/T 5588-2012 — Profile modification technology and result evaluation in water well
National·Recommended
Valid$479.00
PDF
SY/T 5599-2012 — Compiling specification for the mud logging summary report of exploration wells
National·Recommended
Valid$1,279.00
PDF
SY/T 5697-2012 — The specification for names of data in the oil production management
National·Recommended
Valid$434.00
PDF
SY/T 5703-2012 — Nomenclature specification of data items for petroleum well logging
National·Recommended
Valid$274.00
PDF
SY/T 5704-2012 — Specification for calibration of formation dipmeter logging tool
National·Recommended
Valid$224.00
PDF
SY/T 5705-2012 — The specification for names of data in downhole operation
National·Recommended
Valid$839.00
PDF
SY/T 5706-2012 — Specification values of data attributes for oil and gas reserves results
National·Recommended
Valid$324.00
PDF
SY/T 5708-2012 — Standard names of data items for construction and management of oil-gas field(surface engineering)
National·Recommended
Valid$1,279.00
PDF
SY/T 5713-2012 — The specification for names of data in the gas production engineering
National·Recommended
Valid$669.00
PDF
SY/T 5729-2012 — Heavy oil thermal-recovery well cementing operation procedure
National·Recommended
Valid$304.00
PDF
SY/T 5731-2012 — Method for calculating the hanging load of casing strings
National·Recommended
Superseded$315.00
PDF
SY/T 5738-2012 — Labor quota of oil production equipment repair
National·Recommended
Valid$679.00
PDF
SY/T 5739-2012 — Labor quota of power transformer equipment maintenance
National·Recommended
Superseded$590.00
PDF
SY/T 5749-2012 — Labor quota for installation engineering of oil and gas gathering and transferring process
National·Recommended
Superseded$710.00
PDF
SY/T 5751-2012 — Codes for names and colors of rocks in the petroleum geology
National·Recommended
Valid$1,029.00
PDF
SY/T 5752-2012 — Nomenclature specification of data items for petroleum logging
National·Recommended
Valid$354.00
PDF
SY/T 5769-2012 — Land seismic exploration ancillary data P1/90 format
National·Recommended
Superseded$495.00
PDF
SY/T 5783.1-2012 — Specification for injection and production profile logging data processing and interpretation. Part 1: Vertical well
National·Recommended
Withdrawn$345.00
PDF
SY/T 5806-2012 — Oil and gas stratigraphic code
National·Recommended
Superseded$525.00
PDF
SY/T 5807-2012 — Technology method for hydraulic piston pump trip operation and test
National·Recommended
Valid$404.00
PDF
SY/T 5821-2012 — Water shutoff technology with organic plugging agent for carbonate reservoir
National·Recommended
Valid$434.00
PDF
SY/T 5844.1-2012 — The specification for names of data in the petroleum geology experiments. Part 1: Geochemistry
National·Recommended
Valid$739.00
PDF
SY/T 5844.2-2012 — The specification for names of data in the petroleum geology experiments. Part 2: The sedimentary rock mineral
National·Recommended
Valid$839.00
PDF
SY/T 5847-2012 — The drawing and application method of dynamic control chart for rod-pumping well
National·Recommended
Valid$304.00
PDF
SY/T 5863-2012 — The procedure for the ESP pulling out and installation
National·Recommended
Valid$354.00
PDF
SY/T 5867-2012 — Coding for hte classified methodologies of petroleum resources assessment
National·Recommended
Superseded$225.00
PDF
SY/T 5874-2012 — Evaluation method on oil well water plugging
National·Recommended
Superseded$135.00
PDF
SY/T 5886-2012 — Methods for evaluating performances of retarded acid
National·Recommended
Superseded$195.00
PDF
SY/T 5896-2012 — Labor quota of gas production engineering
National·Recommended
Valid$1,379.00
PDF
SY/T 5897-2012 — Labor quota of gas transmission engineering
National·Recommended
Valid$579.00
PDF
SY/T 5906-2012 — The method for plotting chart on pressure-loss curve through water nozzle
National·Recommended
Valid$194.00