NB/Z — Energy Guiding
Found: 10
26 pages
NB/Z 20598-2021 — Guide for the nuclear power plant control room human factors engineering integrated system validation
Industry·Recommended
Valid$465.00
39 pages
NB/Z 20617-2021 — Public communication guide for nuclear power projects in preliminary stage
Industry·Recommended
Valid$515.00
15 pages
NB/Z 20625-2021 — Important operating experience of nuclear power plant human factor engineering
Industry·Recommended
Valid$935.00
15 pages
NB/Z 20540-2019 — Guidelines for the application of commodity-level items in safety-grade electrical instrumentation and control equipment in nuclear power plants
Industry·Recommended
Valid$875.00
15 pages
NB/Z 20541-2019 — Guidelines for hazard analysis of important software for nuclear power plant safety
Industry·Recommended
Valid$375.00
47 pages
NB/Z 20289-2014 — Guidelines for software verification and validation plan in nuclear power plants
Industry·Recommended
Valid$790.00
67 pages
NB/Z 20326-2014 — Analysis methodology for uncertainty of setpoints for instrumentation of safety system in nuclear power plants
Industry·Recommended
Valid$1,030.00
22 pages
NB/Z 20249-2013 — Guidance for use of probabilistic safety assessment for classification of functions for instrumentation and control system important to safety in nuclear power plants
Industry·Recommended
Valid$395.00
36 pages
NB/Z 20250-2013 — Guidance for the decision on modernization for instrumentation and control system important to safety in nuclear power plants
Industry·Recommended
Valid$700.00
17 pages
NB/Z 42001.1-2012 — The norm of energy consumption per unit product of thermal power equipment manufacturing enterprises - Part 1: Utility boiler
Industry·Recommended
Valid$355.00