QC/T 917-2013Manual shut-off valves for gas-fuelled vehicles (English PDF)
燃气汽车专用手动截止阀
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for QC/T 917-2013 in 30 minutes.
Issued by
MIIT
Level / Type
Industry · Recommended
Issue date
April 25, 2013
Implementation date
September 1, 2013
Scope
QC/T 917-2013 is the English-translated version of 燃气汽车专用手动截止阀.
QC/T 917-2013 is the Chinese standard "Manual shut-off valves for gas-fuelled vehicles".
Its scope clause reads: This Standard specifies the definitions, structure requirements, technical requirements, test methods, inspection rules, mark, package, transportation and storage of manual valve for gas vehicle (hereinafter referred to as shut-off valve).
This Standard is applicable to compressed gas shut-off valve for vehicle (hereinafter referred to as CNG shut-off valve) of which the rated working pressure is not greater than 20MPa (the pressure in this Standard refers to gauge pressure), the environment temperature is -40 ~ +85 °C and working medium conforms to the requirement of GB 18047 AND liquefied petroleum gas shut-off valve (hereinafter referred to as LPG shut-off valve) for vehicle of which the rated working pressure is not greater than 2.2MPa, the environment temperature is -40 ~ +85 °C and working medium conforms to the requirement of GB 19159. Its clauses include mark, package, transportation and storage.
Found what you need?
Document preview — QC/T 917-2013
National Standard of the People's Republic of China
Issued by: Ministry of Industry and Information Technology of the People's Republic of China
Contents
- Foreword3
- 1 Scope4
- 2 Normative references4
- 3 Terms and definitions5
- 4 Requirements5
- 5 Test methods8
- 6 Inspection rules13
- 7 Mark, package, transportation and storage14
1 Scope
This Standard specifies the definitions, structure requirements, technical requirements, test methods, inspection rules, mark, package, transportation and storage of manual valve for gas vehicle (hereinafter referred to as shut-off valve).
This Standard is applicable to compressed gas shut-off valve for vehicle (hereinafter referred to as CNG shut-off valve) of which the rated working pressure is not greater than
20MPa (the pressure in this Standard refers to gauge pressure), the environment temperature is -40 ~ +85 °C and working medium conforms to the requirement of GB 18047 AND liquefied petroleum gas shut-off valve (hereinafter referred to as LPG shut-off valve) for vehicle of which the rated working pressure is not greater than 2.2MPa, the environment temperature is -40 ~ +85 °C and working medium conforms to the requirement of GB 19159.
2 Normative references
The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this Standard.
GB/T 191 Packaging - Pictorial Marking for Handling of Goods
GB/T 7762 Rubber, Vulcanized or Thermoplastic - Resistance to Ozone Cracking -
Static Strain Test
GB/T 9969 General Principles for Preparation of Instructions for Use of Industrial
Products
GB/T 10125 Corrosion Tests in Artificial Atmospheres - Salt Spray Test
GB/T 17895 Natural Gas Vehicle and Liquefied Petroleum Gas Vehicle - Vocabulary
GB 18047 Compressed Natural Gas for Vehicle
GB 19159 Automotive Liquefied Petroleum Gas
GB/T 19239 Mounting Requirements of Special Equipment for Liquefied Petroleum […]
4.2.7 Pressure resistance
It is tested according to the method in 5.9; and the shut-off valve has no crack, permanent deformation, etc.
4.2.8 Durability
After it is tested according to the method in 5.10, the sample piece has no damage and deformation; and it shall conform to the requirements of 4.2.1 ~ 4.2.3.
4.2.9 Corrosion resistance
a) After it is tested according to the method in 5.11.1, it must conform to the requirement of normal temperature leakage test in 4.2.3.
b) After the copper or brass pressing part is tested according to the method in 5.11.2, it shall be checked by 25-times magnifying glass; and there is no crack on the shut-off valve.
4.2.10 Ozone resistance
After the ozone resistance test is carried out according to the test method in 5.12, there is no crack.
4.2.11 Compatibility
After the compatibility test is carried out according to the test method in 5.13, the volume change rate does not exceed 20%; and the mass decrease rate does not exceed 5%.
4.2.12 Torque strength
After it is tested according to the method in 5.14, the sample piece has not damage and deformation; and it shall conform to the requirement of normal temperature leakage test in
4.2.3.
4.2.13 Bending moment strength
After it is tested according to the method in 5.15, the sample piece has no crack and damage; and it shall conform to the requirement of normal temperature leakage test in
4.2.3.
5.6 Temperature resistance test
The shut-off valve is installed on the special device; the shut-off valve is in closing state.
After the nitrogen or air is injected from the air inlet of the shut-off valve to the nominal working pressure, it is maintained for 2h (one hour for opening and closing, respectively) under the following conditions; the low temperature leakage test and high temperature leakage test are carried out according to the method in 5.5.
a) It is placed in low temperature box, so that the temperature reaches -40°C±2°C;
b) It is placed in high temperature box, so that the temperature reaches 85°C±2°C.
5.7 Dry heat resistance test
After non-metal parts contacting with natural gas in CNG shut-off valve AND non-metal part contacting with liquefied petroleum gas in LPG shut-off valve are exposed for 168h in
85°C±2°C of high temperature, check the tensile strength and elongation rate change.
5.8 Vibration resistance test
The shut-off valve is reliably installed on the clamp of sine vibration test table, so that the shut-off valve is in a closing state. The nitrogen or air is filled from the air inlet of the shut-off valve to the nominal working pressure; the frequency is set as 17Hz; the amplitude is set as 1.5mm; and it vibrates for 2h along three mutual-vertical directions, respectively.
5.9 Pressure resistance test
The shut-off valve is firmly installed on the special sealed test table, so as to block the outlet of the shut-off valve; the test liquid is slowly added to the shut-off valve from the inlet of the shut-off valve; the pressurizing time is not less than 3min; after reaching to the hydrostatic pressure value specified in Table 6, it is stabilized for 3min; relieve the pressure.
The sample for the test must not be used for other tests.
Table 6 Specified value of hydrostatic pressure
Name of test piece CNG shut-off valve LPG shut-off valve
Specified value of hydrostatic pressure 50MPa 6.75MPa
5.10 Durability test
5.10.1
This item test shall use new shut-off valve; the shut-off valve is installed on the special device (see figure 1). The nitrogen or air is filled from the air inlet of the shut-off valve to the nominal working pressure; open the shut-off valve; the pressure of the shut-off […]
14 Compatibility test 5.13 4.2.11 yes AB
15 Torque test 5.14 4.2.12 yes AB
16 Bending moment test 5.15 4.2.13 yes AB
Note: “sqrt” represents the inspection item; ABCDEF are the sampling test piece A, test piece B, test piece
C, test piece D, test piece E, test piece F.
6.2 Exit-factory inspection
The manufacturer shall check the item piece-by-piece according to the regulations in
Table 8; only after it is inspected as qualified by the inspection department, can the conformity certificate be issued and the product be delivered from the factory.
6.3 Type inspection
The type inspection samples shall be sampled from the qualified products that are newly produced and pass the exit-factory inspection; the sampling quantity is shown in Table 8.
All items in type inspection shall be qualified. If any one item is not qualified, then the sampling is doubled for re-inspection; and it is indicated in the inspection result.
For any one of the following conditions, the type inspection shall be carried out according to the items in Table 8. The newly designed product shall be subjected to product design review according to the requirements in 4.1.
a) New design or when design parameter, process and material have significant change;
b) When resuming production after shutdown for more than one year;
c) When it is continuously produced for three years.
7 Mark, package, transportation and storage
7.1 Mark
7.1.1 Nameplate mark
The nameplate shall be fixed at the suitable position of the shut-off valve; the line and words on the nameplate shall be clear; and it must mark:
a) Product name;
b) Product model;
c) Nominal working pressure;
d) Working medium;
e) Manufacturer name;
f) Product serial number;
g) Manufacturing date.
7.1.2 Valve-body mark
The arrow showing the medium flowing direction shall be marked on the shut-off valve-body.
7.2 Package
7.2.1
The pictorial markings for handling of packages shall conform to the regulations of
GB/T 191; and it must ensure that the product is not damaged during the handling process.
7.2.2
The product conformity certificate, operation instructions and necessary packing list shall be provided in the packing box of the product.
The following contents shall be indicated on the product conformity certificate:
a) Manufacturer's name and trademark;
b) Product model and serial number;
c) Seal and inspection date of inspection department.
The instructions shall be compiled according to GB/T 9969; and it must pay attention to the following contents:
a) Structure type and function introduction of valve;
b) Fault judging and elimination method during the use.
7.2.3
The following contents shall be indicated on the outer packing box:
a) Manufacturer's name;
b) Product model and serial number;
c) Appearance dimension (length*width*height);
d) Quantity and gross weight;
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download QC/T 917-2013
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
QC/T 1005-2026 — Performance requirements and bench test methods for hydraulic solenoid valve assembly of electronic stability control system and antilock brake system of automoive
QC/T 1022-2026 — Technical specifications and test methods of reduction gearbox for battery electric vehicles
QC/T 1041-2026 — Control system of fuel evaporative pollutants from Motorcycles with petrol engine
QC/T 917-2013
$115.00