DL/T Standards

Found: 2904 — page 25 of 61

Valid

DL/T 845.5-2021 — General specifications for resistance measuring devices - Part 5: Insulation resistance tester for water internally cooled generators

National·Recommended
Instant delivery (0–9 sec)
$355.0012 pages
Valid

DL/T 846.15-2021 — General Specifications for High Voltage Test Equipment - Part 15: High Voltage Pulse Source Cable Fault Detection Device

National·Recommended
Instant delivery (0–9 sec)
$225.0011 pages
Valid

DL/T 846.16-2021 — General technical requirements for high voltage testing equipment - Part 16: Pressure testing device for power-less oil equipment

National·Recommended
Instant delivery (0–9 sec)
$285.0015 pages
Valid

DL/T 848.6-2021 — General technical requirements for high-voltage test equipment - Part 6: On-site empty and load test equipment for power transformers of 110kV and above

National·Recommended
Instant delivery (0–9 sec)
$485.0016 pages
Valid

DL/T 869-2021 — The welding code of practice for power plant

National·Recommended
Instant delivery (0–9 sec)
$590.0037 pages
Valid

DL/T 876-2021 — Guidelines for Insulation Coordination of Live Work

National·Recommended
Instant delivery (0–9 sec)
$135.007 pages
Valid

DL/T 879-2021 — Portable equipment for earthing or earthing and short-circuiting

National·Recommended
Instant delivery (0–9 sec)
$515.0029 pages
Valid

DL/T 880-2021 — Soft shielding cover for live wires

National·Recommended
Instant delivery (0–9 sec)
$485.0016 pages
Valid

DL/T 892-2021 — Power station steam turbine technical conditions

National·Recommended
Instant delivery (0–9 sec)
$800.0037 pages
Valid

DL/T 893-2021 — Power Station Steam Turbine Terminology

National·Recommended
Instant delivery (0–9 sec)
$1,600.0053 pages
Valid

DL/T 941-2021 — Quality standard for sulfur hexafluoride for transformers in operation

National·Recommended
Instant delivery (0–9 sec)
$150.006 pages
Valid

DL/T 945-2021 — Periodic concrete mixing plant (station)

National·Recommended
Instant delivery (0–9 sec)
$385.0013 pages
Valid

DL/T 946-2021 — Cranes for water conservancy and electric power construction

National·Recommended
Instant delivery (0–9 sec)
$500.0019 pages
Valid

DL/T 1035.7-2020 — Guideline for maintenance of circulating fluidized bed boiler - Part 7: The maintenance of coal and material supply system

National·Recommended
Instant delivery (0–9 sec)
$255.0013 pages
Valid

DL/T 1061-2020 — Photoelectric type CCD pendulum telecoordinometer

National·Recommended
Instant delivery (0–9 sec)
$165.007 pages
Valid

DL/T 1062-2020 — Photoelectric (CCD) wire drawing instrument

National·Recommended
Instant delivery (0–9 sec)
$225.007 pages
Valid

DL/T 1067-2020 — Fundamental technical specification for evaporative cooling hydro generators

National·Recommended
Instant delivery (0–9 sec)
$165.009 pages
Valid

DL/T 1088-2020 — Electromagnetic environment parameters limit for ±800 kV UHV DC transmission lines

National·Recommended
Instant delivery (0–9 sec)
$55.004 pages
Valid

DL/T 1105.1-2020 — The technical guideline of non-destructive inspection for fillet welds of small diameter nozzle stubs on boiler headers in power stations - Part 1: General requirements

National·Recommended
Instant delivery (0–9 sec)
$90.007 pages
Valid

DL/T 1105.2-2020 — The technical guideline of non-destructive inspection for fillet welds of small diameter nozzle stubs on boiler headers in power stations - Part 2: Ultrasonic testing

National·Recommended
Instant delivery (0–9 sec)
$285.0014 pages
Valid

DL/T 1105.3-2020 — The technical guideline of non-destructive inspection for fillet welds of small diameter nozzle stubs on boiler headers in power stations - Part 3: Eddy current testing

National·Recommended
Instant delivery (0–9 sec)
$225.007 pages
Valid

DL/T 1105.4-2020 — The technical guideline of non-destructive inspection for fillet welds of small diameter nozzle stubs on boiler headers in power stations - Part 4: Magnetic memory metal diagnostic technique

National·Recommended
Instant delivery (0–9 sec)
$185.007 pages
Valid

DL/T 1121-2020 — Technical specifications of bag filter system for coal-fired power plants

National·Recommended
Instant delivery (0–9 sec)
$375.0016 pages
Valid

DL/T 1132-2020 — Guidelines for overhauling of boiler water circulating pump motors in power stations

National·Recommended
Instant delivery (0–9 sec)
$195.009 pages
Valid

DL/T 1192-2020 — Protector for splicing sleeve of overhead transmission line

National·Recommended
Instant delivery (0–9 sec)
$270.0014 pages
Valid

DL/T 1215.1-2020 — Chain-circuit static synchronous compensator - Part 1: Functional specification

National·Recommended
Instant delivery (0–9 sec)
$435.0020 pages
Valid

DL/T 1399.4-2020 — Electric Test/Inspection Vehicle - Part 4: Switching Apparatus AC Withstand Voltage Test Vehicle

National·Recommended
Instant delivery (0–9 sec)
$225.0011 pages
Valid

DL/T 1694.6-2020 — Calibration specification for high voltage testing instruments - Part 6: Very low frequency dielectric loss detector for power cable

National·Recommended
Instant delivery (0–9 sec)
$360.0017 pages
Valid

DL/T 1694.7-2020 — Calibration specification for high voltage testing instruments - Part 7: Integrated protection measuring control devices. Electrical measuring

National·Recommended
Instant delivery (0–9 sec)
$255.0012 pages
Valid

DL/T 1981.10-2020 — Unified Power Flow Controller - Part 10: System Test Procedure

National·Recommended
Instant delivery (0–9 sec)
$330.0017 pages
Valid

DL/T 1981.2-2020 — Unified power flow controller - Part 2: Guidelines for system design

National·Recommended
Instant delivery (0–9 sec)
$465.0021 pages
Valid

DL/T 1981.3-2020 — Unified power flow controller - Part 3: Technical specification for control and protection system

National·Recommended
Instant delivery (0–9 sec)
$330.0015 pages
Valid

DL/T 2025.3-2020 — Guide of the maintenance for power plant valve - Part 3: Check valve

National·Recommended
Instant delivery (0–9 sec)
$225.009 pages
Valid

DL/T 2078.1-2020 — Overhaul guide for the condenser - Part 1: Condenser body

National·Recommended
Instant delivery (0–9 sec)
$165.007 pages
Valid

DL/T 2079-2020 — Code for performance evaluation of safety management of hydropower dam

National·Recommended
Instant delivery (0–9 sec)
$300.0014 pages
Valid

DL/T 2080-2020 — Super capacitor for electrical energy storage

National·Recommended
Instant delivery (0–9 sec)
$210.009 pages
Valid

DL/T 2081-2020 — Testing code of super capacitor for electrical energy storage

National·Recommended
Instant delivery (0–9 sec)
$480.0022 pages
Valid

DL/T 2082-2020 — Specification of traceability coding for electrochemical energy storage system

National·Recommended
Instant delivery (0–9 sec)
$150.008 pages
Valid

DL/T 2083-2020 — Ultrasonic Measurement Regulations for Storage Capacity of Hydropower Stations

National·Recommended
Instant delivery (0–9 sec)
$450.0022 pages
Valid

DL/T 2084-2020 — Guide on electromagnetic compatibility in DC converter station valve halls

National·Recommended
Instant delivery (0–9 sec)
$150.008 pages
Valid

DL/T 2085-2020 — Technical requirements for noise reduction materials and noise reduction devices in substations

National·Recommended
Instant delivery (0–9 sec)
$225.0011 pages
Valid

DL/T 2086-2020 — Microphone array measurement method of noise from high voltage transmission lines and substations

National·Recommended
Instant delivery (0–9 sec)
$240.0013 pages
Valid

DL/T 2087-2020 — Technical Guidelines for Cogeneration of Heat Supply in Thermal Power Plants

National·Recommended
Instant delivery (0–9 sec)
$330.0017 pages
Valid

DL/T 2088-2020 — Guide for insulation coordination of DC earth electrode lines

National·Recommended
Instant delivery (0–9 sec)
$270.0012 pages
Valid

DL/T 2089-2020 — Guidelines for the use of flue gas DeNOx catalysts in coal-fired power plants

National·Recommended
Instant delivery (0–9 sec)
$105.006 pages
Valid

DL/T 2090-2020 — Guidelines for flue gas DeNOx catalysts scrap of fossil-fuel power plant

National·Recommended
Instant delivery (0–9 sec)
$105.006 pages
Valid

DL/T 2091-2020 — Determination of condensable particulate matter in flue gas of coal-fired power plant -- Dry impinger method

National·Recommended
Instant delivery (0–9 sec)
$105.006 pages
Valid

DL/T 2092-2020 — Specification for electrical start-up test of fossil power generating units

National·Recommended
Instant delivery (0–9 sec)
$240.0012 pages