Browse Standards
Found: 226547 — page 4009 of 4720
Withdrawn
SY/T 6206-1996 — General Technical Conditions for Digital Control Well Logging Tool Series
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Withdrawn
SY/T 6209-1996 — Complex fault block oilfield development programming technical requirements
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Withdrawn
SY/T 6210-1996 — The total amount of clay minerals in sedimentary rocks and common non-clay minerals X-ray diffraction method for quantitative analysis
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6211-1996 — Shallow seismic refraction work quota
National·Recommended
Instant delivery (0–9 sec)
$240.00PDF
Withdrawn
SY/T 6212-1996 — Labor quota gas logging project
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6213-1996 — Technical conditions for fluoroboric acid for acidification
National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Superseded
SY/T 6214-1996 — Evaluation method for acid densifier
National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Valid
SY/T 6216-1996 — Test Method of Cross-linkers for Fracturing
National·Recommended
Instant delivery (0–9 sec)
$234.00PDF
Superseded
SY/T 6217-1996 — Pipeline oil equipment maintenance work quota
National·Recommended
Instant delivery (0–9 sec)
$920.00PDF
Superseded
SY/T 6218-1996 — Directional window casing section milling and operating methods
National·Recommended
Instant delivery (0–9 sec)
$70.00PDF
Superseded
SY/T 6219-1996 — Grading of Development Status of Oil Fields
National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Valid
SY/T 6220-1996 — Calculation method for recoverable reserves of solution gas in oil reservoirs
National·Recommended
Instant delivery (0–9 sec)
$325.00PDF
Withdrawn
SY/T 6221-1996 — Oilfield development monitoring system design and dynamic monitoring of the technical requirements
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6222-1996 — External casing packer
National·Recommended
Instant delivery (0–9 sec)
$150.00PDF
Superseded
SY/T 6223-1996 — Solids control equipment installation, use and maintenance
National·Recommended
Instant delivery (0–9 sec)
$205.00PDF
Withdrawn
SY/T 6224-1996 — Technical requirement for compilation of development plan project gas--condensate field
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6225-1996 — Technical requiremet for analysis of oilfield performance
National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Withdrawn
SY/T 6226.1-1996 — Oil spare valve pneumatic components - Part 1: Manual Valve
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Withdrawn
SY/T 6226.2-1996 — Oil drilling equipment valve pneumatic components - Part 2: Pneumatic valve
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6227-1996 — Petroleum industry database design specifications
National·Recommended
Instant delivery (0–9 sec)
$420.00PDF
Superseded
SY/T 6228-1996 — Recommended Practices for Occupational Safety Oil and Gas Well Drilling and Servicing Operations
National·Recommended
Instant delivery (0–9 sec)
$530.00PDF
Superseded
SY/T 6229-1996 — Training for initial fire attack
National·Recommended
Instant delivery (0–9 sec)
$405.00PDF
Superseded
SY/T 6231-1996 — Electronic downhole pressure gauge
National·Recommended
Instant delivery (0–9 sec)
$135.00PDF
Withdrawn
SY/T 6232-1996 — Petroleum core analysis experimental equipment classification
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6233-1996 — Trial operation of natural gas pipeline specifications
National·Recommended
Instant delivery (0–9 sec)
$135.00PDF
Superseded
SY/T 6234-1996 — Buried Pipeline overall heat transfer coefficient of determination of the heat balance method
National·Recommended
Instant delivery (0–9 sec)
$165.00PDF
Withdrawn
SY/T 6235-1996 — General Technical Conditions of Surface Instruments for Digital Control Well Logging
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6236-1996 — Code of information for reservoir engineering
National·Recommended
Instant delivery (0–9 sec)
$435.00PDF
Superseded
SY/T 6237-1996 — Downhole equipment repair work quota
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Withdrawn
SY/T 6238.1-1996 — OCTG full-scale test methods. Casing collapse trial
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6240-1996 — Chemical analgsis method of barite
National·Recommended
Instant delivery (0–9 sec)
$405.00PDF
Withdrawn
SY/T 6241-1996 — Cluster wells wellsite layout principles and requirements
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6243-1996 — The engineering logging specification of hydrocarbon exploratory well
National·Recommended
Instant delivery (0–9 sec)
$135.00PDF
Valid
SY/T 6244-1996 — Design regulations for well site of oil and gas exploratory well
National·Recommended
Instant delivery (0–9 sec)
$144.00PDF
Superseded
SY/T 6246-1996 — Vibrator service and maintenance
National·Recommended
Instant delivery (0–9 sec)
$90.00PDF
Superseded
SY/T 6247-1996 — Technical specification of 3D seismic exploration for mountainous area
National·Recommended
Instant delivery (0–9 sec)
$355.00PDF
Valid
SY/T 6248-1996 — Technical code for use and maintenance of total stations
National·Recommended
Instant delivery (0–9 sec)
$325.00PDF
Superseded
SY/T 6249-1996 — Operation and maintenance for proton magnetometer
National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Withdrawn
SY/T 6250-1996 — Specification of density logging calibration devices
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6252-1996 — Specification of induction logging calibrating devive
National·Recommended
Instant delivery (0–9 sec)
$85.00PDF
Superseded
SY/T 6253-1996 — Specific regulations for horizontal well perforation
National·Recommended
Instant delivery (0–9 sec)
$229.00PDF
Valid
SY/T 6254-1996 — Use and maintenance of side wall coring gun
National·Recommended
Instant delivery (0–9 sec)
$165.0015 pages
Withdrawn
SY/T 6255-1996 — Use and maintenance of sidewall core gun
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Superseded
SY/T 6257-1996 — Injection and production wells steam stimulation process design
National·Recommended
Instant delivery (0–9 sec)
$105.00PDF
Superseded
SY/T 6258-1996 — Practice for design calculations for sucker rod pumping systems (conventional units)
National·Recommended
Instant delivery (0–9 sec)
$470.00PDF
Withdrawn
SY/T 6259-1996 — Gas Mining Technical Specification
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Withdrawn
SY/T 6261-1996 — Injection well pressure drop data analysis method explained
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF
Withdrawn
SY/T 6262-1996 — Process specification test gas wells
National·Recommended
Instant delivery (0–9 sec)
$225.00PDF